Qingdao Ruly Steel Engineering Co.,Ltd
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Custom Prefabricated Steel Structure Warehouse Building for Industrial Storage

Price Negotiable
Price: 35-50 USD/Sqm
MOQ: 200 Sqm
Delivery Time: 15-20 workdays
Brand: Ruly Steel
Product Description

Heavy Duty Steel Structure Warehouse for Machinery Production and Storage
 

The Custom Prefabricated Steel Structure Warehouse Building is a reliable and cost-effective solution for industrial, commercial, and logistics storage applications. Manufactured with high-strength structural steel and precision fabrication technology, it provides excellent structural performance, rapid installation, and long-term durability.

Designed to maximize usable storage space, the warehouse features a large clear-span structure that minimizes interior columns, allowing efficient movement of forklifts, trucks, and warehouse equipment. The modular steel system also enables flexible building dimensions, making it suitable for projects ranging from small storage facilities to large logistics distribution centers. 


Every warehouse is engineered according to local wind loads, snow loads, and seismic requirements to ensure safety and structural reliability. Various roof and wall systems, including insulated sandwich panels and single steel sheets, are available to accommodate different climate conditions and operational needs.
 


With advantages such as reduced construction time, lower foundation costs, easy future expansion, and minimal maintenance, prefabricated steel warehouses have become the preferred choice for manufacturers, distributors, agricultural enterprises, and logistics companies around the world.


Our experienced engineering team provides comprehensive support throughout the project, including structural design, fabrication, quality inspection, packaging, shipping, and installation guidance, ensuring a smooth and efficient building process from concept to completion..

Name Custom Prefabricated Steel Structure Warehouse Building for
Industrial Storage
Structure Type portal frame structure, truss frame, flat frame structure
Length 20m~200m
Width 20m~50m
Eave Height 4m~30m
Roof Slope Recommend 5~15% according to site
Steel beam & Column H-section steel, truss steel, steel tube, latticed steel, cross-section steel
Roof & Wall cladding

Galvanized steel cladding sheet, sandwich panel (view different panel cores below)

Door Sliding door, folding door, roller shutter door, etc.
Window Aluminum alloy frame window, louvers, etc.
Anti-corrosion for steel structure Alkyd painting, Epoxy painting or Hot-dip galvanized


Our Service

Service Description
Steel Structure Fabrication Cutting, welding, painting, hot-dip galvanizing, and pre-assembly of structural steel components.
Design & Engineering Design, engineering, fabrication, and installation support for prefabricated steel buildings.
Shop Drawing Services Detailed fabrication drawings and shop drawings based on client-provided architectural and structural plans.
Engineering Consulting Structural optimization, technical consultation, and project support from design to construction.


Comparison of Roofing and Wall Systems

Item Steel Sheet EPS Panel Rock Wool Panel PU/PIR Panel Glass Fiber + PVC/Aluminum Foil
Initial Cost Lowest Low-Medium Medium High Low
Thermal Performance Poor Good Good Excellent Good
Fire Resistance Poor Moderate Excellent Good Moderate
Sound Absorption Poor Moderate Good Good Moderate
Recommended Application Warehouses, sheds, equipment shelters in mild climates Industrial buildings requiring economical insulation Factories, warehouses, workshops with high fire protection requirements Cold storage, food processing plants, energy-efficient industrial buildings Large-span steel buildings requiring economical thermal insulation

Quality Inspection

Inspection Item Purpose Details
Material Inspection Verify raw material quality ·Thickness tolerance <0.25mm
·Yield and tension strength testing in-house 
·Third party inspection certificate 
·Traceable mill certificate
Welding Inspection Ensure weld integrity ·100% testing dimension tolerance <1mm
·20% sample welding line ultrasonic testing, no fault, full penetration
·20% magnetic particle testing, no bubble, no defect
·Third-party inspection available
Coating Inspection Check paint thickness ·Surface Preparation Grade Sa 2.5, no visible rust, no mill scale and contaminants, welding spatters removed
·Primer to be applied within 4-6 hours after blasting and before any visible flash rusting occurs. Dry film thickness (DFT) : 75 ± 15 μm

   

Magnetic Particle Testing

 

Packaging&Shipping

All steel components are bundled and secured on steel pallets for safe handling and transportation.


The pallets are loaded into containers using gantry cranes and forklifts, ensuring efficient and damage-free loading. 


Certifications





Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Ruly Steel Engineering Co.,Ltd
Location Tieshan Industrial zone, Huangdao District, Qingdao City.
Contact Person steven

Request A Quote

Please check your email address.
Your message must be at least 20 characters.