Qingdao Ruly Steel Engineering Co.,Ltd
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Prefabricated Steel Structure Warehouse with Sa 2.5 Surface

Price Negotiable
Price: USD29-USD99 Per Square Meter
MOQ: 500 Square Meter
Delivery Time: 30 Days
Brand: Ruly Steel
Product Description
Pre Steel Structure Building Materials Warehouse Sa 2.5
Product Specifications
Attribute Value
Type Prefabricated Steel Structure Building
Raw steel material Q235B, Q355B
Surface treatment Painting
Shot blasting level Sa 2.5
Service life 50 Years
Wall and Roof Glass wool
Working scope Design, Fabrication, Installation
Application Warehouse, workshop, factory building
Key Advantages
  • Custom architectural drawings available
  • Fast and flexible assembly with safety features
  • Excellent thermal and noise insulation properties
  • Waterproof and fire prevention capabilities
  • Cost-effective with reduced construction time
  • Durable structure with 50+ year lifespan
  • Engineered to prevent leaks and water seepage
  • Strong resistance to wind, seismic activity, and snow loads
Technical Parameters
Item Details
Material Carbon structural steel
Production Lead Time Typically 45 days after down payment (varies by quantity)
Quality Certification Factory quality certificate, third-party available upon request
Dimensions H beam: 4000-15000mm length
Thickness Web plate: 6-32mm, Wing plate: 6-40mm
Height 200-1200mm
Color Options Customizable to customer requirements
Minimum Order Quantity 1000 m² (width × length × eave height)
Main Components
Component Specification
Base Cement and steel foundation bolts
Main Frame H Steel beam, Q235/Q355 steel H beam and columns (painted or galvanized)
Secondary Frame Galvanized C or Z purlin, steel bracing, tie bar, knee brace, flashing
Material Standards Q235B, Q355B or custom (ASTM, BSEN, DIN, IPE, AISI, JIS)
Purlin C or Z purlin: Size from C120~C320, Z100~Z200
Column Types X-type, tree type, lattice, Cross, Box
Bolt Types Plain bolt and High-strength bolt
Pre Steel Structure Warehouse Building
Packing
Steel structure packing method 1
Steel structure packing method 2
Frequently Asked Questions
Q: How is product quality guaranteed?
We maintain a dedicated QC team to inspect all orders before shipment.
Q: What is the typical installation time?
Installation typically takes about 1 month, depending on building size.
Q: Is the structure insulated?
Yes, insulated sandwich panel walls and roofs are available in various thicknesses.
Q: Is the building rainproof?
Yes, roof panels are well-joined with a complete drainage system.
Q: Are all components included?
Yes, we provide complete turn-key projects with all necessary components.
Q: Can you source related equipment?
Yes, we can source and ship additional equipment to save freight costs.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Qingdao Ruly Steel Engineering Co.,Ltd
Location Tieshan Industrial zone, Huangdao District, Qingdao City.
Contact Person steven

Request A Quote

Please check your email address.
Your message must be at least 20 characters.