TOBO STEEL GROUP CHINA
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

Low Price Oil Drilling Tube A335 P9 P11 P22 High Temperature Seamless Carbon Steel Pipe Astm A106

Price Negotiable
Price: Depending on quantity
MOQ: 1pcs
Delivery Time: 25-30 days depending on quantity
Brand: TOBO
Product Description

low price Oil drilling tube A335 P9 P11 P22 High Temperature seamless carbon steel pipe astm a106

 

Products Description
Seamless pipe is a kind of hollow section, no joint around the strip of steel. 1. Seamless pipe for structure 2. Seamless pipe for fluid transport 3. Seamless tube for low and medium pressure boiler 4. Seamless tube for high pressure boiler 5. High-pressure seamless tube for fertilizer equipment 6. Seamless pipe for petroleum cracking 7. Steel pipes for geological drilling 8. Seamless tube for diamond core drilling 9. Oil drilling pipe 10. Carbon steel seamless pipe for Marine use 11. Seamless tube of automobile half axle sleeve pipe 12. High pressure tubing for diesel engines 13. Precision inner diameter seamless tubes for hydraulic and pneumatic cylinders 14. Cold-drawn or cold-rolled precision seamless pipe 15. Seamless steel tubes for low temperature pipes
Product name
Seamless steel tube/pipe/seamless steel pipes/carbon seamless steel pipe
Standard
API 5L, ASME, ASTM B36, JIS, DIN, GB8162, GB8163, GB5310,etc.
Material
ASTM A106 GRB/ A53 GRB/ API 5L X42,X52,X60,X65,X70GRB/API 5 CT/ Q345/ ST42/ST37/ ST52.Q195/Q215/Q235/A179etc.
Thickness
2.5mm-75mm
Length
5.5m, 5.8m, 6m, 11.8m, 12m etc , other length is Available according to demands.
Outer diameter
5mm-630mm
Surface treatment
Black painting, black varnish, transparent oil, hot galvanized,
3PE,epoxy coating,BE,PE.etc.
Technique
Cold Rolled (Cold drawn)And Hot Rolled
Application
petroleum,chemical industry,electric power,boiler,high temperature resistant,
low temperature resistant, etc.
Package
1. Packed with 8 bundles tightened with metal belt and plastic wrapped if need
2. According to customer’s requirement
Delivery time
7-15 Days, It depends on the specific situation and quantity
Payment Term
T/T Or L/C
Application
Fluid conveying pipe, boiler plant, engineering, machinery processing plant.
Product packaging
Company Profile
00:00
 
02:54
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO STEEL GROUP CHINA
Location No.208,Lvdi Road,Baihe Town,Qingpu District,Shanghai,China
Contact Person Ms.

Request A Quote

Please check your email address.
Your message must be at least 20 characters.