TOBO STEEL GROUP CHINA
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

Alloy Steel Boiler Tube 120mm ASTM A335 P2 P5 P9 P11 P12 P22 Alloy Steel Round Pipes

Price Negotiable
Price: negotiable
MOQ: 1PCS
Delivery Time: 15 workdays
Brand: TOBO
Product Description

Alloy Steel Boiler Tube 120mm ASTM A335 P2 P5 P9 P11 P12 P22 Alloy Steel Round Pipes

Product Description

 

item Alloy Steel Tube
Standard ASTM A335, ASTM A213, JIS G3458, JIS A3462, DIN17175, GB5310, GB9948
Material P1, P2, P12, P11, P22, P5, P9, P91, P92,T1, T2, T11,T12, T5, T9, T22, ST52, X42, X46,
X52, X60, X70, X80, X100, 15CrMo, Cr5Mo, 10CrMo910, 12Cr2Mo, 13CrMo44, 12CrMo195
42CrMo, 42CrMO4, x12CrMo91, 12CrMo, etc
Application Alloy steel pipe applies to petroleum, chemical industry, electric power, boiler, high
temperature resistant, low temperature resistant, corrosion resistant part. The size
of Alloy steel pipe can be made according to the customers requirements.
Alloy Or Not Is Alloy
Section Shape Round
Special Pipe API Pipe Boiler Pipe
Outside Diameter 6 mm~2500mm
Wall thickness 1mm~120mm
Certificate API
Grade alloy
Surface Treatment Oiled, Black painted, PE coated, HDPE, Varnished
Tolerance ±1%
Processing Service Cutting
Oiled or Non-oiled Slightly Oiled
Delivery Time 10~15 workdays
End protector Plastic Pipe Cap Iron Protector
Product show

 

Why Choose Us?

 

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia, Western Europe etc.

 

Packing & Shipping

 

Packaging Details: Pallet/Wooden Case or as per your Specification

 

Delivery Detail: Shipped in 30 days after payment

 

 
 
FAQ

 

Q: Are you trading company or manufacturer ?

A: We are factory.

 

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TOBO STEEL GROUP CHINA
Location No.208,Lvdi Road,Baihe Town,Qingpu District,Shanghai,China
Contact Person Ms.

Request A Quote

Please check your email address.
Your message must be at least 20 characters.