MSS HG20621 Stainless Steel A304 Lap Joint Stub End
MSS Sp-43 SS 1/2"-48" HG20621 Stainless Steel A304 Lap Joint Stub End Short
Flanging Stub End to the forming method of forming straight wall or flange with certain Angle along the edge of closed or unclosed curve on the plane part or surface part of billet with the action of mold. Flanging is a kind of stamping process. There are many kinds of flanging and the classification methods are not the same. It can be divided into elongation flanging and compression flanging according to deformation properties.
| Size | 1/2"- 24" seamless, 4"-48" seam welding |
| Wall thickness | 2MM----25MM SCH5,SCH10S, SCH10, SCH20, SCH30, STD, SCH40, XS, SCH60, SCH80, SCH100, SCH120, SCH140, SCH160, XXS, SGP, LG, |
| Certification | ISO9001: 2008, PED. |
| Standard | ANSIB16.9, ASME B16.28; DIN 2605, DIN 2615, DIN2616, DIN2617;GOST 17375; GOST 17378; JIS2311 |
| Application | Chemical industry, petroleum industry,construction industry, power industry, gas industry, shipbuilding ,domestic installation |
| Pressure | PN6,10,16,25,40, |
| Grade | ASTM / ASME SA 182 F 304, 304L, 304H, 309H, 310H, 316, 316H, 316L, 316 LN, 317, 317L, 321, 321, 347, 347 H |
| Technics | Forged |
| Material | Carbon steel ,stainless steel ,alloy steel EN 10216-2 (P235GH,P265GH) EN10222-2(P245GH,P280GH) NF A49-213 (TU42C,TU48C) Low Alloy Steel : ASTM A-420(WPL6) ASTM A-234(WP11,WP22,WP5) ASTM A-860(A860-WPHY52) Stainless Steel: ASTMA403M (WP304,WP304L,WP304H,WP316,WP316L,WP321, WP321H,WP347,WP347H) EN10216-5(X2CrNiN18-10(1.4311), X5CrNi18-10(1.4301),X5CrNiMo17-12-2(1.4401),X2CrNiMo17-12-2(1.4404) |
Detailed Production Description
1)Size: Seamless: 1/2”-60" SCH10s-XXS
2)Standard: ANSI B16.9/B16.11/B16.28, DIN, JIS, ISO
3)Material:
- carbon steel: A234-WPB WPC
- Alloy steel: A420-WPL6, A234-WP11, A234-WP12, A234-WP5, A234-WP9, A234-WP22,15Mo3,15CrMoV,35CrmoV
- stainless steel: A403 WP 304-304L-304H-304LN-304N A403 WP 316-316L-316H-316LN-316N-316TiA403/ WP 321-321H A403 WP 347-347H
- low tempture steel: A402 WPL3-WPL6
- high performance steel: A860 WPHY 42-46-52-60-55-70
4)Surface treatment:
- carbon steel: shot blasted, black painting, rust-proof oil, transparent oil, galvanizing, hot galvanizing
- alloy steel: Shot blasted, black painting, rust-proof oil, transparent oil, galvanizing, hot galvanizing
- stainless steel: pickled, Polish
5)Nominal wall thickness: SCH5-SCH160, STD, XS, XXS
6)Packing: Wooden case or wooden pallet according to the size of fittings
7)Delivery time:7-10 days for a 20 ft container
8)Others:
- Special design available
- All the production process are made under the ISO 9001:2000 strictly.
No. of Employees: 200~300 People
In addition, we are authorized by more than 120 top-class mills from South Korea,Japan and China like JFE,SUMITOMO,POSCO,BAOSTEEL, TISCO,LISCO,.TPCO,HENGYANG VALIN and so on .
Related Material
| Material |
Carbon steel(ASTM A105,A350LF2,A350LF3,) |
| Standard | DIN,EN,ASTM,BS,JIS,GB,ASME(ASME16.9/16.20) |
| Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Serrated facing
If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.
If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

