Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

Customizable Gas Pressure Sintering Furnace For Hard Metals Cermets PM Materials

Price Negotiable
Price: USD 93,000-77,000,000
MOQ: 1 set
Delivery Time: 5-8 months
Brand: Ruideer
Product Description

Gas Pressure Sintering Furnace For Hard Metals/Cermets/PM Materials With Customizable Sintering Space

The horizontal design makes it easy to load & unload, as well as easy maintenance. The entire process is of automatic control with safety interlock. Full load continuous operation is realized with its maximum ability of 300 furnace times/year or 300 working days/year. Adopting graphite element resistance heating (low voltage, high current) with multiple heating units, each unit of temperature is individually controlled ; The whole process is controlled by computer automation, monitoring, tracking, fault self-diagnosis simulation display and record. The process is controlled by PLC and industrial control machine (IPC) to realize the one-key start-up of the whole process, real-time dynamic monitoring, temperature, pressure, vacuum and other parameters saving and reliable alarm interlock.


Process Step
1. Vacuum Dewaxing
2. H2-Dewaxing
3. Heating Vacuum (with/without pressure control)
4. Heating Partial Pressure Ar
5. TORVAC
6. Heating High Pressure Gas
7. Cooling High Pressure Gas

 

 

After sinterinng in RDE'S furnace, density, strength, durability and hardness of hard metals would improve a lot, meeting highest demands.

Sintering space 80-450L
Working temperature 1600℃(maximum working temperature)
1550℃(actual working temperature )

 

Pumping speed

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace, under the empty furnace, clean and cold state.)

 

Leakage rate

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)

 

Cooling speed

 

Empty furnace. The cooling time of cooling temperature from 800℃ down to 100℃ just cost less or equal 3 hours.(water temperature≤28℃, 2bar≤water pressure≤3bar)

 

Cooling speed

The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling.
Heating rod material Graphite
Temperature control mode Three zone temperature control independently
Heating up speed

 

Empty furnace heating up≤5℃

 

 

Heating power

 

It is about 120-480KVA

 

UPS guarantee time

 

It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Location No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Contact Person Shirley

Request A Quote

Please check your email address.
Your message must be at least 20 characters.