Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

500kg Load 1MPa Vacuum Sintering Pressurized Furnace For Cemented Carbide

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 70-80work days
Brand: Ruideer
Product Description

Lower Price With Higher Quality Sintering Pressurized Furnace Makes Your Product Have More Possibility

 

 

Effective space: approximately 400 x 400 x 1200 mm

This furnace is designed as a pilot system and mounted on a compact base frame. This allows for a very quick turnaround from delivery to handover on the customer’s premises, and it is very easy to move.

 

Technical parameters:

 

Furnace shell design service life 20years
Fuenace operating time 6000 circles
Effective working zone size(W*H*L) 400mm×400mm×1200mm
Max.loading 500kg
Max.design temperature 1600℃
Max.working temperature 1550℃
Max.design pressure 64bar
Max.working pressure 58bar

After sales:

1.Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.

 

2.Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,
and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)

 

3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Location No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Contact Person Shirley

Request A Quote

Please check your email address.
Your message must be at least 20 characters.