Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

Rapid Cooling Carbon Steel Shell Sinter HIP Furnace For Hard Alloy Products

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 100-120 work days
Brand: Ruideer
Product Description

High performance sinter-HIP furnace---excellent hard alloy product maker

 

Main application
It is used for debinding of high-performance hard alloy materials (it can realize the process of positive and negative pressure dewaxing, and the forming agent is paraffin, PEG or rubber), hydrogen discharge, vacuum sintering, partial pressure sintering, pressure sintering, rapid cooling and other batch production operations and research and development operations in the laboratory.

 

Total requirements
The cemented carbide pressure sinter-HIP furnace is single chamber, horizontal and periodic heating. It adopts low voltage and large current graphite electric heating element for heating. It has several heating units, each of which controls the temperature separately.It has debinding function,which can achieve the positive and negative pressure of two removal processes, molding agent for paraffin, PEG or rubber).Moreover,it also can realize hydrogen discharge, vacuum sintering, partial pressure sintering, sinter-HIP and rapid cooling functions. The whole process by computer automation control, monitoring, tracking, fault self-diagnosis simulation display and record.

 

 

Basic technical parameters and user supporting conditions

 

Design operating times

 

6000 furnace time/year

 

Graphite inner tank valid space

500×500×1800mm
Max.loading capacity 1500kg

 

Max.working temperature

1550℃(under the circumstance of vacuum sintering,heating up to1600℃)

 

Max.design pressure

10.0MPa

 

Max.working pressure

9.5MPa

 

Ultimate vacuum degree

2pa 

(In the empty furnace, clean, cold state, after the vacuum pump started for 60 minutes)

Pumping speed

 

Up to 5PA within 30 minutes of starting pump (in empty furnace, clean, cold state)

 

 

Leakage rate (3-hour average, empty furnace, heating up furnace)

 

 

 

 

Average value of 3Pa /h (empty oven, oven, clean, cold)

 

 

 

Wax collect yield(negative pressure dewaxing)

 

(Argon negative pressure dewaxing of 10Kg pure paraffin)

 

After sales:

1.Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.

 

2.Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)

 

3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Location No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Contact Person Shirley

Request A Quote

Please check your email address.
Your message must be at least 20 characters.