Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

Double Door Sintering Furnace Automatic Safety Interlock Function

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 5-8 months
Brand: Ruideer
Product Description

Double Door Industrial Vacuum Furnace Automatic Sintering/Ar/H2 gas

Technical parameters

 

Valid working space

Customizable

Max design pressure

10-100bar

Pressure time

It takes no more than 25 min to reach 58 bar.

Cooling time (full load)

Cooling time for sintering Temperature 1450℃~100℃: 7-8h

(WaterTemperature≤30℃, 55bar≤pressure≤58bar)

Max.loading weight

The load capacity depends on the product type)

 Power rating

About 400KVA (The output power can be limited)

Service life for furnace shell

20 years

Operating times for furnace shell

6000 furnaces

Max. Design Temperature

1600℃(while vacuum sintering)

Max. Working Temperature

1550℃(vacuum and pressuring)

Pumping speed

The vacuum degree can reach 5Pa within 30min after starting the pump. After reaching 5Pa and then pumping for 60min, the ultimate vacuum value reaches 1Pa (within a cold, empty and clean furnace that has been dried before).

Leakage rate

≤3Pa/h (stop the pump group operation and start checking after testing the limit vacuum (within a cold, empty and clean furnace that has been dried before).

Wax yield rate

≥98%(10Kg pure paraffin, argon negative pressure dewaxing. Measured by three times of mean values at most).

UPS guarantee time

It can power the indicator light and control the furnace during power outage for more than 80 minutes.

Max.heating rate

8℃/min (the room temperature rises to 1900℃within a vacuum and empty furnace. 600℃, 1000℃, 1200℃ half-way insulation is allowed).

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
Location No.755, Xianyuehuan Rd, Tianyuan District, Zhuzhou, Hunan Province
Contact Person Shirley

Request A Quote

Please check your email address.
Your message must be at least 20 characters.