Zhengzhou Duorui enterprise Co., Ltd
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

60mm Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork

Price Negotiable
Price: ~
MOQ: 500 pcs
Delivery Time: 20~30days
Brand: MF
Product Description

Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork

 

Scaffolding Adjustable Prop With Steel Tripod is adjustable because the inner tube can extend and shrink in the outer tube, it can be adjusted according to project requirements. Scaffolding Adjustable Prop With Steel Tripod can be used in different supporting areas, like slab, floor.

 

Specification of Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork: 

 

Product Light or heavy duty steel props with tripod
material welding steel pipe 48/60mm
Grade carbon structure steel Q235
Surface painted, powder coated,galvanized
OEM Yes
Package in bundle or piece by piece
Certificate SGS

 

Advantages of Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork:

 

1. Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork structure is simple, so it is easy to assemble and disassemble, can save space.


2. Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork is made of Q235 steel which is strong and reliable for building construction.


3.Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork can be used to support shoring prop to be more steady for concrete supporting.


4. Scaffolding Adjustable Prop With Steel Tripod For Construction Formwork surface treatment can be painted, powder coated or hot dip galvanized.

 

FAQ: 

1. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

2.what can you buy from us?
Formwork tie rod/tie nut and other accessories, scaffold couplers, frame scaffolding ,steel prop ,base jack and U head ,steel plank ,scaffolding accessories and formwork accessories etc.

 

3.what's the payment item and delivery time?

Payment is 30% paid in advance, the balance paid before shipment. Lead time depents on different products and quantity, we will confirm and inform you during communication.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhengzhou Duorui enterprise Co., Ltd
Location A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China
Contact Person Ada Wu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.