Zhengzhou Duorui enterprise Co., Ltd
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break

Price Negotiable
Price: ~
MOQ: 500 pcs
Delivery Time: 20~30days
Brand: MF
Product Description

Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

The nut and plate is being turned on a tie bar, to clamp formwork plates. The formwork plates make a mould to poor a concrete element.
After the concrete has hardened, the formwork plates have to be removed by losening the nut. While the nut is very firm, they use hammer blows to loosen. After 2 or 3 blows the nut is loose and can be turned of.

To test quality, customer counts the amounts of hammer blows before the nut breaks. Our cast iron wing nut with heat treatment can take 140, up to 150 blows before break.

 

 

 

Specification of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

Tie nut types Formwork wing nut Formwork Ancher tie nut Swivel formwork tie nut
Weight 0.175/0.25/0.3/0.61kg 0.16/0.36/0.5/0.6/0.65/1kg 1.25/1.3kg
Pull strength 140-150KN 170-180KN 170-180KN
Photo
Process Casted
Surface treatment Natural, Electric Galvanized ,Hot Dip Galvanized
Heat treatment For enhance nut's hardness, tensile strength, etc
Match tie rod 12/17/20MM or customized size
Material Ductile casted iron QT450-10
Color Self-color (black), silver galvanized or golden galvanized

 

 

Advantages of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

OEM service

* products, logos, package, all could be customized as request.

 

First-Hand price

* Manufacturer with trade ability* Professional foreign trade business and service team* OEM available

 

High Quality

 

* Can take 140, up to 150 blows before break.
* Heat treatment and nice galvanized surface.
 
Stable Supply
* Two casting & one welding factories to sure stable supply.
* All factories have Government-approved environmental qualifications
 

 

What else we supply:

We also supply formwork accessoris, tie nut, tie rod, plastic sleeve, cone, formwork plate, water stopper, scaffold props, scaffold frame, scaffold coupler, jack base, plastic rebar caps, plastic roman pillar, plastic safety fence, OEM service. Please feel free to contact us for one stop shopping of construction products from China, best price and service will be offered!!!

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhengzhou Duorui enterprise Co., Ltd
Location A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China
Contact Person Ada Wu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.