Office Building IP44 T8 36W 6500K LED Tube Light Bulbs
Waterproof T8 tube 36W 6500K for Office building
Advantage
- Perfect compatibility with Electronics ballast.
- Specialized PC cover design for optimal light distribution and smooth visual effect.
- patent design endcap, high quality DLC approval.
- security no leakage , waterproof, antiaging.
- 270 degree bean angle.
- Power factor: same as ballast in use, usually>0.95.
- High-tech optical design.
Feature
Products Advantages of T8 Alu+PC tube light
Lower luminous decay, 10% at 2000hrs.
Lower energy usage, up to 50% energy saving LED tube.
Environmental friendly LED tube, no mercury content.
Instant start LED tube, no delay and flickers.
IC Driver LED tube, constant cent, safety guaranteed.urr
Passed CE, RoHS, ERP, SAA certification.
More attractive price.
No flash
3. Direct wire to AC 100-277V power without ballast, single side or double sides power input.
Specification
| Power | 36W | Size | 1200mm |
| IP | IP40 | Lumen | >3240Lumes |
| Package | 1240x210x210mm | GW | 11.5kg |
| Power | 18W | Connection | Double end or Single end |
| Head Cover | PVC or Aluminium | Size | 1200mm |
| Input | AC220-240V | Material | Glass+PVC/Aluminium |
| Power | 24W | Size | 1200mm |
| Input |
AC85 -265V |
LPW | 100lm/w |
| LED | 144 pcs 2835 LED | Material | PC Housing |
| CCT | 3000k-6500k | Dimmer | 0-10V dimmer |
Package
Size: 1240x210x210mm, 30 pcs/carton
Port: Shenzhen
Picture
A: If adequate stocks available, led tube lights can be delivered in 1 day. Otherwise, for sample orders, normal samples can be sent in 3-5days; for large quantity orders, products will depart from Shenzhen /Guangzhou/Zhongshan within 15-20days after the deposit received.
Q2. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Q6. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.
Q7: Do you offer guarantee for the products?
A: Yes, we offer 3 years warranty to our products.
Q8: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution i
ncluding re-call according to real situation.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


