Heavy Duty Steel Mezzanine Floor Racking System Multi Levels Shelves Anti Rust
Heavy duty steel mezzanine floor racking system multi-levels shelves
About Mezzanine Racking System:
Specifications of Mezzanine Racking System:
| Material | Stainless Steel Metal Q235 |
| Rack Dimension | L(1200-3500mm) * D(1600-1200mm) * H(3000-12000mm) or custom design |
| Shelves Load Capacity | 100-1000kgs per shelf |
| Floor Load Capacity | 200-500kgs per sqm |
| Color | RAL system, Red coating, Blue coating, Orange coating or Customized |
| Application | Industrial Equipment Racking, Warehouse Storage Shelves, Garage Rackings and etc. |
| Finish | Powder Coated or Galvanized |
| Welding | Robot Welding |
| MOQ | 1 set |
| Supply Ability | 1000 sets per month |
| Payment Terms | 30% deposit upon signing the contract and the balance will be cleared before delivery. |
Feture of Steel Structure Mezzanine Rack System:
Pictures of Mezzanine Racking System:
About Liyuan Company:
Shenzhen Liyuan Industrial Equipment Co., Ltd. is specialized in the development, design, production, sales, installation and service of storage and storage equipment since 2007 . It has become a large-scale storage shelf manufacturer at home and abroad. And advanced companies in the development and production of intelligent industrial equipment. The company has passed ISO9001: 2000 quality management certification, ISO14001: 2004 environmental management system certification, OHSAS18001: 2007 safety management system certification. And has won the honorary title of China's quality and credit enterprise and the title of advanced intelligent and technological enterprise.
FAQ:
1. How do you ensure your product and service quality?
A: All our processes strictly adhere to ISO-9001 procedures. Raw material inspect ---- First Production Confirm ---- Painting inspect ------ Full inspect before packing. And we have 3 years quality warranty against BL issue date.
2. How to install the racks?
A: You will get detailed install instruction for the rack you custom. If needed, we can provide our engineers to instruct your workers.
3. What is delivery time?
This depends on the product. Typically standard products are delivered within 20 days.
The delivery time of the special products is according to the time of setting up of the tooling.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

