Steering Cylinder Seal Kit 215-2023 2152023 For 416 416E III 420F2 422F2 427F2 428F2 Backhoe Loader

Price Negotiable
Price: USD, RMB
MOQ: 1Sets
Delivery Time: 1-7days
Brand: Huilian
Product Description

Steering Cylinder Seal Kit 215-2023 2152023 For 416 416E III 420F2 422F2 427F2 428F2 Backhoe Loader
 
Product Description

Name215-2023 2152023 Backhoe Hydraulic Cylinder Seal Kit
Applicable PeopleMachinery Repair Shops, Retail, Construction works , Energy & Miing
PackingPlastic bag, box, carton
QualityChina good quality ORING(good quality)
Quality CertifiionAchieved
Product SizeStandard size/custom size
Expiration dateTo be negotiated


 
Fit excavator model
416 416E III 420F2 422F2 427F2 428F2 414E 424D 426 416E 428F 416F 420D 422F 432E 442D 420E 430D 432F 442E 422E 432D 420 428D 416D 428E 432F2 430F2 416F2 415F2 420F 430E 430F
 
BACKHOE LOADER

Part NoPart NamePart Info
1180866CYLINDER & MTG GROUP-COUPLER118-0866 CYLINDER & MTG GP-COUPLER
S/N 8CR1-UP
PART OF 122-6468 COUPLER AR-QUICK
Type 2
AN ATTACHMENT
1783713CYLINDER GROUP-COUPLER178-3713 CYLINDER GP-COUPLER
S/N 8CR1-3242
50.8-MM (2-IN) BORE X 80.5-MM (3.17-IN) STROKE
PART OF 122-6404 CYLINDER & MTG GP-COUPLER
ALSO AN ATTACHMENT
1903085CYLINDER GROUP-COUPLER190-3085 CYLINDER GP-COUPLER
S/N 8CR3243-UP
51-MM (2-IN) BORE X 158-MM (6.22-IN) STROKE
PART OF 196-1979 CYLINDER & MTG GP-COUPLER
1226404CYLINDER & MTG GROUP-COUPLER122-6404 CYLINDER & MTG GP-COUPLER
S/N 1RR1-997; 2BR1-910
FIELD INSTALLATION
PART OF 119-4118, 137-6399, 138-9796, 148-2301, 149-1062 LINES GP-COUPLER
Type 2
AN ATTACHMENT
1783713CYLINDER GROUP-COUPLER178-3713 CYLINDER GP-COUPLER
S/N 1WR8116-10736
50.8-MM (2-IN) BORE X 80.5-MM (3.17-IN) STROKE
PART OF 122-6404 CYLINDER & MTG GP-COUPLER
AN ATTACHMENT
9T8823CYLINDER GROUP-PIN COUPLER9T-8823 CYLINDER GP-COUPLER
S/N 1MR956-1179; 1YR1517-2191
51-MM (2-IN) BORE X 158-MM (6-IN) STROKE
PART OF 122-6404 CYLINDER & MTG GP-COUPLER
AN ATTACHMENT
1545419CONTROL AR-RIDE154-5419 CONTROL AR-RIDE
S/N 1NR954-1049; 1ZR926-999
POWER SHIFT
CANNOT BE USED WITH LOADER LOCK VALVES
AN ATTACHMENT
9T8823CYLINDER GROUP-PIN COUPLER9T-8823 CYLINDER GP-COUPLER
S/N 1PR1599-1815; 2AR1604-1874
51-MM (2-IN) BORE X 158-MM (6-IN) STROKE
PART OF 122-6404 CYLINDER & MTG GP-COUPLER
AN ATTACHMENT
1226404CYLINDER & MTG GROUP-COUPLER122-6404 CYLINDER & MTG GP-COUPLER
S/N 1RR998-UP; 2BR911-UP
FIELD INSTALLATION
PART OF 148-2301, 149-1062 LINES GP-COUPLER
Type 2
AN ATTACHMENT
1226404CYLINDER & MTG GROUP-COUPLER122-6404 CYLINDER & MTG GP-COUPLER
S/N 9AR770-1008
FIELD INSTALLATION
PART OF 122-6466 COUPLER AR-QUICK
AN ATTACHMENT


The Reason Why Choose Us?
1. Quality Control – Huilian uses raw materials which made for high quality only,same standard as OEM genuine parts. We have never compromised our quality with inferior materials. Our insistence in high quality for raw materials, mold design, production, and packing make us stand out from the other factories
2. Technical Support – Our mold design and development department is comprised of knowledgeable people. YFW is equipped with the advanced CNC mold developing machines. We test all of the raw materials and study the most advanced ones.
3. Research & Development- We have a strong research and development capacities, constantly seeking new technologies and methods to achieve higher performance, competitiveness and quality.
4. Sample Test –Samples are always available for checking quality and can be dispatched to you very quickly.
5. Stock –More than 5,000 items stocked and available in our inventory, both inch and metric sizes are available. One stop service and immediate delivery.
6. After Sales – We provide a wide variety of support, such as servicing and maintenance support.

 
FAQs
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,we can pack the goods in your branded boxes after getting your authorization letters.
 
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products andpackages before you pay the balance.
 
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
 
Q4. How about your delivery time?
A: Generally, it will take 7 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
 
Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
 
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Huilian Machine Equipment Co., Ltd.
Location 1st Floor, No. 389, East Zhongshan Avenue, Huangpu District, Guangzhou City, China
Contact Person KOKO XIAO

Request A Quote

Please check your email address.
Your message must be at least 20 characters.