45 Degree Inclination Pipe Screw Conveyor For Loading Sand
45 Degree Inclination Pipe Screw Conveyor For Loading sand
Pipe Screw Conveyor is suitable for all industries such as power industry, coal industry, building material, chemical industry, metallurgyand grain industry, for horizontal or tilted transportation for powdery, granular and small lump materials, such as cement,coal, dust, residue and grain which their temperature is less than 200℃.
2. Sealed delivery can be achieved, which is conducive to the delivery of materials that are easy to fly, hot and odor, can reduce environmental pollution, and improve the working conditions of port workers.
3. Compact size, small cross-section size, small footprint. It is easy to get in and out of hatches and carriages during unloading operations at the port.
4. Reliable work, easy maintenance and management.
| Model number | LSY140 | LSY160 | LSY200 | LSY250 | LSY300 | LSY400 | ||
| Screw diameter(mm) | 140 | 163 | 187 | 238 | 290 | 365 | ||
| Rotating speed(r/min) | 300 | 300 | 260 | 200 | 175/300 | 175 | ||
| Outer diameter(mm) | 168 | 194 | 219 | 273 | 325 | 402 | ||
| Max length(m) | 11 | 12 | 13 | 16 | 18 | 18 | ||
| Incline degree(α°) | 0°~60° | 0°~60° | 0°~60° | 0°~60° | 0°~55° | 0°~55° | ||
| Conveying capacity(t/h) | 9-17 | 30-20 | 50-32 | 70-53 | 82-60/120-85 | 140-110 | ||
| Motor | Model | L≤-7 | Y132S-4 | Y132S-4 | Y132M-4 | Y160L-6 | Y180M-4 | Y180M-4 |
| Power(kw) | 5.5 | 5.5 | 7.5 | 11 | 18.5 | 18.5 | ||
| Model | L>7 | Y132S-4 | Y132M-4 | Y160M-4 | Y180L-6 | Y180L-4 | Y180L-4 | |
| Power(kw) | 5.5 | 7.5 | 11 | 15 | 22 | 22 | ||
How to Select Correct Model Tube Screw Conveyor :
1. Are you a factory or a trading company
We are a factory,and you are warmlyh welcomed to pay an on-site visit!
2. Can you offer the customized solution to my case?
We have R&D team who will handle your case and come up with an ideal solution
3. What's the accepted payment term?
T/T L/C Western union,cash and so on.
4. Are you engineers available for overseas installation and training matters?
5. How long is your lead time for the machines
Normally 20 workdays after the deposit is reached.Nonstandard equipments could be longer depends on certain case
Yes,and all the relative costs should be covered by you
How to packing and delivery machine !!!
Usually packed with seaworthy wooden box packing and we can accepted customer sepical required .
Working site :
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


