OEM Cryogenic Safety Valve Stainless Steel 304/316 for Water Heater Gas -80℃ to +120℃ Temperature Range
Price:
USD83-
MOQ:
1 pcs
Delivery Time:
5-8 work days
Brand:
CNLN
Product Description
Product Overview
OEM cryogenic safety valves manufactured from premium stainless steel 304/316, specifically designed for water heater gas systems and cryogenic applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Valve Type | Safety Valve |
| Connection Type | Screw/Thread |
| Nominal Diameter | Customizable |
| Nominal Pressure | Customizable |
| Set Pressure | 0.92 MPa, 1.76 MPa, 2.42 MPa |
| Suitable Temperature | -80℃ to +120℃ |
| Design & Manufacture | Conforms to GB/T24925-2010 |
| Testing Standard | Conforms to GB/T13927-2008 |
Material Composition
| Component | Material |
|---|---|
| Valve Body | CF8 (Stainless Steel) |
| Valve Disc | 06Cr19Ni10 (Stainless Steel 304) |
| Valve Seat | 05Cr19Ni10 (Stainless Steel 304) |
| Seal Material | PTFE |
| Disc Face Ring | PCTFE |
Application Details
Suitable Media: O2, N2, Ar, LNG, LCO2, and other cryogenic gases
Valve Lifetime: Specified according to usage frequency and installation location
Product Dimensions
| Product Code | H (mm) | H1 (mm) | L (mm) | M1 | M2 | D0 (mm) | D1 (mm) | D2 (mm) |
|---|---|---|---|---|---|---|---|---|
| C158DJ15 | 179 | 62 | 47 | M45×2 | M36×2 | 36 | 15 | 32 |
| C158DJ25 | 159 | 51 | 46 | M30×1.5 | M30×1.5 | 22 | 12 | 26 |
Product Images
Delivery & Lead Times
Customized Valves: 30-45 days production time
Stock Valves: Within 5 days
Delivery Terms: EXW, FOB, CFR, CIF, DDU
Frequently Asked Questions
Q: May I have contact information or social contact tools?
A: Yes, we provide multiple contact options including official email, LINE, WeChat, WhatsApp, and Viber for customer service.
Q: May I have some free samples for evaluation?
A: We charge for samples and shipping fees for initial orders. Sample costs are fully refunded upon confirmation of quantity orders.
Q: What are your delivery terms?
A: We offer EXW, FOB, CFR, CIF, and DDU delivery options.
Q: How about your delivery time?
A: Standard delivery is 3-40 days after receiving advance payment, depending on product items and order quantity.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
SiChuan Liangchuan Mechanical Equipment Co.,Ltd
Location
No.789,Baiyun Road,East Industrial Park,Xindu District,Chengdu City,Sichuan Province P.C. 610500
Contact Person
Doris