Xiamen Creator Technology
                                                                                                           
Verified Supplier
19 Years
Since 2007
Menu

OEM/ODM Full Service Plastic Product Development with In-House Design Engineering and Complete Mold Design for Custom Retail-Ready Packaging

Price Negotiable
Price: Negotiation
MOQ: 100 Pieces
Delivery Time: 25-35 working days for new mold, 7-15 days for production
Brand: Creator
Product Description

OEM ODM Full Service Plastic Product Development with In-House Design Engineering Assembly Packaging

Bring your product idea to life with Xiamen Creator Technology Co., Ltd.'s OEM/ODM full-service plastic product development. From initial concept sketches and 3D CAD design through prototype validation, mold manufacturing, mass production, and final packaging, our integrated in-house team handles every step under one roof.

Key Features & Advantages

  • In-house industrial design team for concept development and 3D modeling
  • Rapid prototyping: 3D printing and CNC machining for design validation
  • Complete mold design and manufacturing with Moldflow simulation
  • Multi-cavity production molds with automated robotic handling
  • Assembly services: mechanical, adhesive, ultrasonic welding, heat staking
  • Custom retail-ready packaging with graphic design support

Technical Specifications

Service TypeOEM/ODM Full Service Development
DesignIndustrial Design, 3D CAD, Rendering
Prototyping3D Printing (SLA/SLS/FDM), CNC Machining
Mold TypeSingle/Multi Cavity, Hot Runner, 2-Shot
AssemblyMechanical, Welding, Heat Staking, Adhesive
PackagingRetail Box, Blister, Clamshell, Palletized Export
Injection Machine80-800 ton, 20+ machines
Lead Time35-55 working days full project

Manufacturing Excellence

Our OEM/ODM development team includes industrial designers, mechanical engineers, mold designers, and project managers who work collaboratively with clients from concept through production. We use UG NX, SolidWorks, and CATIA for 3D design and Moldflow for injection simulation. Our integrated facility ensures seamless transitions between development phases with no information loss or supplier handoff delays.

Frequently Asked Questions

Q: Can you develop a product from just an idea?

A: Yes. Share your concept or requirements and our design team will create 3D models, renderings, and prototypes for your approval before moving to production.

Q: Do you sign NDA agreements?

A: Absolutely. We sign comprehensive NDAs to protect your intellectual property and design confidentiality throughout the development process.

Q: What is the typical development timeline?

A: A full OEM/ODM project from concept to first production typically takes 35-55 working days, depending on product complexity and mold requirements.

Q: Who owns the mold and design files?

A: You own 100% of the mold and all design files. We provide complete CAD data, mold drawings, and documentation upon project completion.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xiamen Creator Technology
Location Zengcuoan,Siming district, Xiamen, China 36000
Contact Person Welson

Request A Quote

Please check your email address.
Your message must be at least 20 characters.