Shenzhen BYF International Limited
                                                                                                           
Verified Supplier
25 Years
Since 2001
Menu

BPW 12T Trailer Spare Part Axles Square Beam 1840MM Inboard Drum Axle

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: 15 Days
Brand: BYF
Product Description

BPW 12T Trailer Spare Part Axles Square Beam 1840MM Inboard Drum Axle

 

Technical Requirements

 

1. All welding points are free of any spatter and welding slag, all welding seams are welded by CO2 protection welding, and the welding seams are beautiful and firm.


2. The product is sprayed with four coats of paint, that is, two coats of primer and intermediate top coat and top coat. The thickness of the paint film is not less than 0.08mm. Use high-quality polyurethane top coat and varnish. Need to be dried.


3. Mainly do not bump into during transportation.


4. Standard assembly, no brutal operation is allowed.


5. The torque of the connecting bolt shall be implemented according to the GB/T 16938-2008 standard.

 

OEM NO. German Type 12T
Color Black
Material 20Mn2
Apply to BPW
Type Semi-Trailer
Weight 372 KG
Brake 420*180mm
Axle Beam 150*150
Stud 10-M22*1.5
Bearing Inner33118 outer33213
Loading Port Qingdao Port Or As Required

 

Product Details

 

Drawing Details

 

 

 

Axle Structure

 

 

 

BYF German Type Axle Drum Series Specification

 

Max. Capacity Track Brake Centre Distance Of Spring Seat Axle Beam Wheel Fixing Total Length
Stud P.C.D Hole Diameter
12 1840 420*180 ≥980 150*150 10*M22*1.5 335 281 ~2146
12 1840 420*200 ≥980 150*150 10*M22*1.5 335 281 ~2146
14 1840 420*180 ≥980 150*150 10*M22*1.5 335 281 ~2180
14 1840 420*200 ≥900 150*150 10*M22*1.5 335 281 ~2180
14 1840 420*220 ≥980 150*150 10*M22*1.5 335 281 ~2242
16 1850 420*200 ≥900 150*150 10*M22*1.5 335 281 ~2242
16 1850 420*220 ≥980 150*150 10*M22*1.5 335 281 ~2242

 

 

Factory Production

 

 

 

 

 

 

 

 

Packing & Delivery

 

1. 58PCS/20"Container

 

2. 500*500*2200MM

 

 

 

 

 

FAQ

Q: Are you trading company or manufacturer ?

A: We are professional factory with 20 years manufacturing history

Q: How long is your delivery time?

A: Generally it is 3-7 days for the samples, 25-35 days for 1-3 container. it is according to quantity.

Q: Do you provide samples ? Is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: T/T in advance ,30% deposit, balance before shippment.
If you have another question, pls feel free to contact us as below.

 

 

Factory Video

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen BYF International Limited
Location Room 711,Block F, Mingyue Huadu Building, Gonghe Gongye Ave, Xixiang Street, Bao'an District, Shenzhen, Guangdong, China
Contact Person Jon Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.