380V End Fired Glass Melting Furnace with Regenerator for Waste Gas Recycling 1100°C-1400°C Temperature Range
Price:
Negotiable
MOQ:
1 set
Delivery Time:
150 days after received the down payment
Brand:
JEFFER
Product Description
Industrial Glass Melting Furnace Overview
This 380V end-fired furnace with regenerator is engineered for efficient waste gas recycling in glass production. The furnace serves as the essential melting device for industrial glass manufacturing, featuring a longitudinal burner arrangement and U-shaped flame combustion path for optimal performance.
Key Performance Advantages
| Long Flame Technology | Extended flame path for complete combustion |
| High Heat Utilization | Superior thermal efficiency through regenerator design |
| Low Energy Consumption | Reduced operational costs through waste gas recycling |
| Cost-Effective Investment | Lower capital expenditure with high ROI |
| Compact Footprint | Space-efficient design for optimized facility layout |
Critical Melting Process Factors
| Raw Material Characteristics | Material composition and physical properties |
| Chemical Components | Precise chemical formulation requirements |
| Material Feeding Method | Controlled batch introduction techniques |
| Melting Temperature Control | Precise thermal management from 1100°C to 1400°C |
Furnace Component Specifications
Working Tank
Standard semidiameter matches melting tank width with depth typically 300-400mm shallower than the main melting chamber.
Dog House Preheating Section
Operates at 1100°C-1400°C for initial batch material pre-melting and thermal conditioning.
Combustion Port System
Critical component for fuel-air mixing, preheated air intake, and waste gas exhaust management.
Flame Space Configuration
Integrated space formed by breast wall, crown, and gable walls ensuring complete fuel combustion for effective material melting and clarification.
Throat Section
Core furnace component influencing glass quality and operational campaign duration, with temperature reduction during glass flow transition.
Regenerator System
Advanced waste heat recovery using checker brick technology to preheat combustion air with exhaust gases, significantly increasing working temperatures while optimizing energy utilization.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
JEFFER Engineering and Technology Co.,Ltd
Location
4FL, B3 Saturn Builing, No. 98 Star Road, New North Zone, Chongqing, China
Contact Person
Maggie YU