Shenzhen Zecheng Automation Equipment Co.,Ltd
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu
Machinery Production line Other processing line

6PPM/ Min Lithium Battery Production Line 5KW Ultrasonic Cell Pre Welding Machine

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: 90 workdays
Brand: Zecehng
Product Description

6 PPM/Min Lithium Battery Production Line 5KW Ultrasonic Cell Pre Welding Machine

 

1. Brief introduction of equipment
After winding or lamination is completed, the lithium electrode lug is preliminarily welded by an ultrasonic welding machine.
2. Equipment composition

NO.

 

Name

 

Quantity

 

Unit

 

Remarks

 

1

 

Frame and cover

 

1

 

Set

 

 

2

 

Feeding mechanism

 

1

 

Set

 

 

3

 

Rotary table mechanism

 

1

 

Set

 

 

4

 

Electric core positioning mechanism

 

1

 

Set

 

 

5

 

Welding mechanism

 

2

 

Set

 

Equipped with 2 sets of popular science 5.6KW ultrasonic wave and vacuum cleaner

 

6

 

Safety grating

 

1

 

Set

 

 

7

 

Cutting mechanism

 

1

 

Set

 

 

8

 

Shaping and dedusting mechanism

 

1

 

Set

 

 

9

 

Electronic control system

 

1

 

Set

 

 

 

3. A six-station layout is adopted, and the battery core and the fixture are fixed and then processed in each sequence. The precision divider is used to drive each station to rotate. The whole process of the equipment is equipped with accompanying clamps. The battery core is pressed and fixed on the clamps by a pre-tightening plate without displacement, which can reliably improve the welding accuracy.

Cooperation commitment

1. New equipment promise

Our company guarantees that the goods provided to customers are brand new, complete and unused equipment.

2. Confidentiality commitment

Our company promises that without the written permission of any party, the other party's related drawings, technical information, business information and other business secrets and technical secrets must not be leaked to third parties in any way.

3. After-sales service commitment

(1) Two months from the date of shipment of the equipment, Party B is responsible for non-human faults in a timely and free warranty within one year (when the equipment is faulty, the after-sales service staff will respond within 2 hours after receiving the notification. According to the situation, personnel must be in place within 48 hours. No later than 60 hours, to ensure the continuity of production by the buyer;

(2) After the equipment has passed the warranty period, if there is a problem, the two parties communicate and deal with it. If necessary, after-sales personnel will be sent to repair it, and only the cost will be charged. Zh

(3) During the warranty period stipulated in the contract and technical agreement signed by the two parties, the company will provide a warranty for quality problems that are not caused by human damage during the normal use of our products.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Zecheng Automation Equipment Co.,Ltd
Location Add:3F Tonggangda building, Yangyong industrial park, Tangxiayong community, Yanluo street, Baoan district, Shenzhen City,Guangdong Province,China
Contact Person Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.