Fabrication Services Sheet Metal Fabrication

Oem Zinc Plating Small Metal Stamping Parts Customized

Price Negotiable
Price: According to drawing
MOQ: According to product drawing
Delivery Time: Upon the order quantity
Product Description

 

OEM Metal Stamping Parts With Zinc Plating Customized Metal Stamped Parts



1. Materials: carbon steel (hot rolled,cold rolled,strip steel), stainless steel, aluminum, brass ,etc
2. Porcessing: Stamping, punching, bending, welding, threading, grinding ,milling, machining, lathe,assembling etc.
3. Press: From 5 MT to 315 T.
4. Finish: Anodizing, Powder-Coating, Zinc-Plated, Chrome coated ,Nickel Plated ,Hex Chromates Zinc, Rust-inhibiting oils, Electrophoresis, Paints and primers, blacking, etc

5. Industry:these parts are used in Automotive, Electrical, Building, Furniture, Machine assembly, Computer, Air industry.
6. OEM orders are welcomed, for any stamping parts

7. Clients mainly located in US and Europe countries.
8: Stamping Series: Stamped part, guard board, precision metal stamping, pressing parts with powder coated, stamping metal part, pressing and streching parts, pressing parts with glanvized, stamping hardware, sheet metal stamping.

 

Service steps

1. Customer supply drawngs or samples 

2. Tools making after quotation accepted

3. Supply samples for checking

4. Mass production after samples were approved

Specification Strictly according to Drawing or samples
Unit price Depends on order quantity. 
Surface Painting / Powder Coating / Hot dipping / Electro galvanizing / Silver Plating / Polishing etc
Related service Cutting, Bending, Welding, Machining, Die casting, Paiting, etc
Packing Master carton or Wooden case, customized
Shipment 1) By courier, like DHL, TNT, Fedex, etc, usually 5-7 days to arrive.

2) Sample order:30% deposit first, and the balance should be paid before delivery.

3) Mass production: 30% deposit first, and the 70% balance should be paid before dlivery.
Payment 1) By courier, like DHL, TNT, Fedex, etc, usually 5-7 days to arrive.

2) By air to airport, usually, 3-4 days to arrive.

3) By Sea port, usually 15-30 days to arrive

 

Products show:

 

 

Our workshop:

 

 

Our warehouse:

 

 

Our packaging:

 

 

 

Our service:

 

A. Plant area-80,000sqm

B. 200-300 trained workers

C. Our Engineer can quickly read the drawing and calculate the price.

D. Our Factory produce products efficiently

E. Gurantee the quality and lead time.

F. Good and timely After-sales service

 

Contact us with your drawing of OEM products, we will give you the best choice.

 

Lily zhang

 

Related Videos

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co.,LTD
Location Room 402.Dongbao Building,No.19 Dongbao Road,Chaoyang,Beijing 201613,China
Contact Person Ben

Request A Quote

Please check your email address.
Your message must be at least 20 characters.