Water Control Plastic Foot Valve Upvc Foot Valve For Water Pump
China factory high quality water control water treatment upvc plastic foot valve
Describe
CPVC plastic bottom valve, CPVC bottom valve is suitable for various light and heavy industrial working conditions and construction pipelines. Plastic bottom valves are widely used in: electrical, paper, boiler, pharmaceutical, mining, chemical, machinery and equipment pipelines, electronic industry, urban construction and other fields.
|
Item Name
|
Foot Valves
|
|
Use
|
Agriculture irrigation/Mariculture/Swimming pool/Engineering construction
|
|
Colour
|
Many colors available for choice
|
|
Material
|
UPVC
|
|
Sample
|
Free provided
|
|
Certificate
|
ISO9001:2015
|
|
Delivery
|
7-30days
|
|
Packing
|
Carton, Polybag, Color Box or Customized
|
Product structure
The bottom valve is composed of valve body, valve cover, valve disc, sealing ring and gasket. After the bottom valve is connected to the pipeline, the liquid medium enters the valve body from the direction of the valve cover, and the pressure of the liquid acts on the valve disc, so that the valve disc is opened to allow the medium to flow through. When the medium pressure in the valve body changes or disappears, the valve disc Close prevents backflow of media.
The bottom valve has multiple water inlets on the bonnet and is equipped with a screen to reduce the inflow of sundries and reduce the probability of blockage of the bottom valve. Although the bottom valve is equipped with an anti-clogging screen, the bottom valve is generally suitable for cleaning media, and the media with excessive viscosity and particles should not use the bottom valve.
F&Q
Q1:How can I get more information about your product?
A1:You can send us an email or ask our online representatives and we can send you the latest catalog and price list.
Q2:Do you accept OEM or ODM?
A2:Yes,But we have quantity requirements.please contact us directly.
Q3:What is the payment way of your company?
A3:T/T,sight L/C,Paypal,Western Union
Q4:What is the shipping way?
A4:By sea,air,Fedex,DHL,UPS,TNT etc.
Q5:How long for manufacturing once we place order?
A5:It's about 5-7 days after payment or disposit.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

