Taikang Yinyu Boiler Manufacturing Co., Ltd
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Professional Electric Heating Steam Boiler No Pollution Low Energy Conservation

Price Negotiable
Price: $5,000.00-$10,000.00
MOQ: 1
Delivery Time: 7-30 work days
Brand: Yinyu
Product Description

No Pollution High Efficiency Fully Automatic Electric Heating Steam Boiler

 

Steam boiler steam with water, is a serious impact on the

later use, may also cause some damage to the product, in

order to avoid this problem, we must find out the response

measures in a timely manner. The problem of steam belt

water may suddenly appear during the operation of the

boiler, which not only greatly reduces the efficiency of the

boiler, but also has a certain impact on the safety of the

staff. Therefore, as soon as signs of steam strip water appear,

it must be treated immediately.
1, the relevant standards have been clearly defined, saturated

steam boiler steam humidity is not greater than 3% is

qualified. If there is a more serious steam belt water, it must

be inspected or treated from all aspects, otherwise it will

directly affect its normal use; At the same time must ensure

that the boiler at the normal water level, high water level will

reduce the space of steam, and then the appearance of

steam belt water, at the same time it is necessary to check

whether the installation of the inner part of the boiler is in 

line with the drawing requirements, in particular, the water-

cooled wall guide pipe and the box inserted into the cylinder

of the seal and the drum welding requirements full welding,

sealbetween should also be welded tightly, otherwise the

soda mixture without the underwater plate will directly short

into the steam pipe, causing serious steam.
2, steam boiler between the underwater plate should be

sealed, to prevent short circuit of the soda mixture; When the

boiler is in operation, the continuous sewage valve should be

opened, so that the amount of sewage in the boiler

evaporation of about 5%, in order to reduce the expansion of

pot water and prevent the formation of foam.
3, the boiler internal pipe installation should be down, if

there is no problem above, can be welded under the outlet

pipe uniform plate a 400 x 400 x 4 steel plate, which can

reduce the steam with water. When the boiler gas volume is

serious, should be the air package design is too small, can be

appropriately reduced the level of liquid, to increase the

space of steam, reduce the amount of water with the dresser.
4, in accordance with the above-mentioned way to carry out 

detailed inspection and improvement of the boiler, I believe

that it will have a greatly reduced chance of water problems,

so that the steam humidity generated by the steam boiler can

also be controlled within the permitted range, to ensure that

the equipment can meet the user's use requirements, of

course, it can also extend the use of the period.
In dealing with the problem of steam boiler steam with water,

we must first carefully check the inside of the equipment, see

if there is any fault problem, timely solution, in order to avoid

the next re-emergence, must do a good job of post-

maintenance work, this is very important, no product

equipment can be used in the absence of maintenance for a

long time, of course, maintenance methods must be correct

and in line with the actual use of the boiler, maintenance

interval is fixed, Frequent maintenance of them can only have

bad consequences.

 

Parameters

 

WDR1-0.7

 

NO; Name Unit Number Description
1 Rated output t/h 1  
2 Rated working power Mpa 0.7  
3 Rated steam pressure 170  
4 Heating efficiency % 99  
5 Output diameter mm DN50  
6 Design fuels / Electric  
7 Safety valve diameter mm DN40  
8 Bulk size mm 3420×1760×1930  
 

WDR2-0.7

 

NO; Name Unit Number Description
1 Rated output t/h 2  
2 Rated working power Mpa 0.7  
3 Rated steam pressure 170  
4 Heating efficiency % 99  
5 Output diameter mm DN80  
6 Design fuels / Electric  
7 Safety valve diameter mm DN50  
8 Bulk size mm 3700×1900×2100  
 
Our services
 

Pre-sale service:
We help customer choose the best boiler model according to

different requirements of various industry. Before delivery we

will provide foundation drawing, layout drawing, boiler room

layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the

production process to ensure on time delivery with perfect

finished product.
After-sale service:
1.provide full range of original spare parts.
2.Engineers abroad installation and commissioning service is

available.
3.Our engineers will held a training for boiler workers to

ensure the safe operation.
4.Free maintenance and repair for one year and lifelong

service.

 

Boiler application areas

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Taikang Yinyu Boiler Manufacturing Co., Ltd
Location Fucaolou Town East 3000 Meters Northbound, Taikang County, Henan Province, China
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.