Ruixin Energy Equipment
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

10K Wireline Tee Joint Wireline Pressure Control Equipment 2" - 7"

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: 3-4 weeks
Brand: Ruixin
Product Description

10K Wireline Tee joint Wireline Pressure Control Equipment 

 

Ⅰ. Introduction
The Wireline
Tee joint is attached below the BOP,The Wireline Pumping tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee body is a pressure release valve . After installing the pressure
release valve, it can be used for pressure relief to ensure safe operation.

II. General Technical Parameters
                                                  

Bore

Work Pressure

Service

Connection

PN

2.5"

5K 10K

Std H2S

5"-4ACME

S0*-0*.0*.00

3"

5K

H2S

5"-4ACME

S0*-0*.0*.00

3"

10K

Std

5"-4ACME

S0*-0*.0*.00

3"

10K

Std H2S

5-3/4"-4ACME

S0*-0*.0*.00

2.5"

15K

H2S

5-3/4"-4ACME

S0*-0*.0*.00

4"

5K 10K

Std

6-1/2"-4ACME

S0*-0*.0*.00

3"

15K

Std H2S

7-1/2"-4ACME

S0*-0*.0*.00

5"

5K

Std H2S

8-1/4"-4ACME

S0*-0*.0*.00

4"

10K

Std H2S

8-3/8"-4ACME

S0*-0*.0*.00

5"

5K 10K

Std H2S

9"-4ACME

S0*-0*.0*.00

4"

15K

Std H2S

9-1/2"-4ACME

S0*-0*.0*.00

6.38"

10K

Std H2S

11-1/2"-4ACME

S0*-0*.0*.00

                                                       

Ⅲ. Pressure Testing:
1. Install the pressure test connector and connect the pressure test line;
2. Start the pressure test pump to carry out the pressure test. Refer to the specific specifications and drawings for the test pressure and time. Fill in the test record card.

Ⅳ. Daily Maintenance
1.After use, the O-ring and seal should be replaced;
2.When not in use, should take the protector and brush the thread with anti-rust oil for storage.
Welcome to contact us at any time.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Ruixin Energy Equipment
Location Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Contact Person Selina Qiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.