Ruixin Energy Equipment
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Test Cap Wireline Pressure Control Equipment

Price Negotiable
Price: USD 1500~
MOQ: 1
Delivery Time: 4-8weeks
Brand: Ruixin
Product Description

Test Cap Wireline Pressure Control Equipment

Ⅰ. Introduction

The test cap sets are designed for testing pressure control equipment and consist of :a blanking

cap and collar for testing box connections and a test cap for testing pin connections. Blanking and

test caps come with bleed ports 1/2NPT.Blanking cap and collar sub-assemblies are also used on

wellhead adapter assemblies.

II. General Technical Parameters

                                                     OTIS Quick Union

Bore Work Pressure Service Connection Seal Dia.
2.5" 5K 10K Std H2S 5"-4ACME 3.5"
3" 5K H2S 5"-4ACME 3.5"
3" 10K Std 5"-4ACME 3.5"
3" 10K Std H2S 5-3/4"-4ACME 4"
2.5" 15K H2S 5-3/4"-4ACME 4"
4" 5K 10K Std 6-1/2"-4ACME 4.75"
3" 15K Std H2S 7-1/2"-4ACME 5.5"
5" 5K Std H2S 8-1/4"-4ACME 6.188"
4" 10K Std H2S 8-3/8"-4ACME 5.25"
5" 5K 10K Std H2S 9"-4ACME 6.75"
4" 15K Std H2S 9-1/2"-4ACME 6.25"
6.38" 10K Std H2S 11-1/2"-4ACME 8.25"

                                                        BOWEN Quick Union

Bore Work Pressure Service Connection Seal Dia.
2.5" 5K 10K Std H2S 4-3/4"-4ACME 3.75"
3" 5K 10K Std 4-3/4"-4ACME 3.75"
3" 5K H2S 4-3/4"-4ACME 3.75"
3" 5K Std H2S 5-1/2"-4ACME×2 4.375"
3" 10K Std 5-1/2"-4ACME×2 4.375"
2.5" 15K Std H2S 6-5/16"-4ACME 4.375"
3" 10K Std H2S 6-5/16"-4ACME 4.375"
3" 15K Std H2S 7"-5STUB ACME 4.375"
4" 5K H2S 7"-5STUB ACME 4.375"
4" 10K H2S 8-1/4"-4ACME×2 6.0"

 

. Structure Features

The test cap mainly consists of a body, a nut, a plug, a circlip and an O-ring. The body is a joint capable

of withstanding high pressure. The joint is provided with an O-ring and an external union female joint.

Union nut is made of alloy steel with wrench hole, and can be screwed with hook wrench during installation.

. Use method

1. Align The test cap with the internal coupling head and screw on the union nut. Remove the plug and

connect the pressure line.

2. Use a hook wrench to tighten the union nut to start the pressure test.

.Maintenance

Thread and O-ring shall be coated with lubricating grease and stored with thread protector. If any damage

is found to the O-ring, it shall be replaced in time.

Welcome to contact us at any time.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Ruixin Energy Equipment
Location Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province
Contact Person Selina Qiang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.