Langfang Baiwei Drill Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

114.3mm Diameter Steel Oil well Welding On Drill Pipe

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: 20-30 working days, which will be adjusted according to different products and inventory
Brand: Longway
Product Description


High Quality Steel DTH Drill Pipe For Drilling Oilwell

 

Product Description

 

According to different application, different diameters of drill tubes are needed, basically, smaller DTH hammers need smaller DTH drill tubes, vice versa. Usually we are offering 50mm, 60mm, 76mm, 89mm, 95mm, 102mm, 114mm, 127mm, 140mm, 159mm.


 

OD
A
Wall
B
Length
L
Weight
lbs
ID
Pin C
Across
Flat D
Flat
Length E
Dist From
Shoulder F
Flat
Length G
Across
Flat H
Connection
3.5" .315" 20' 245 1.75" 2.75" 12.5" 3.25" 2.25" 3.25" 2 3/8IF
4.5" .337" 20' 345 1.75" 3" 12.5" 3.25" 2.375" 4" 3 1/2 Reg
4 1/2" .337" 20' 345 2 1/8" 3" 12 1/2" 3 1/4" 2 3/8" 4" 2 7/8 IF
4 1/2" .337" 25' 430 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .337" 25' 430 2 1/8" 3" 12 1/2" 3 1/4" 2 3/8" 4" 2 7/8 IF
4 1/2" .337" 30' 510 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .500" 25' 510 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .500" 30' 615 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
4 1/2" .750" 25' 805 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .500" 25' 695 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .500" 30' 775 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .750" 30' 1100 1 3/4" 3" 12 1/2" 3 1/4" 2 3/8" 4" 3 1/2 Reg
5" .750" 25' 930 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco
5 1/2" .750" 25' 1045 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco
5 1/2" .750" 30' 1240 1 1/2" 3" 12 1/2" 3 1/4" 2 3/8" 4 5/8" 3 1/2 Beco

 

 

Drill pipe usage notes

 

1. New drill pipe should be pasted oil before connection
2. Make up and break at least 3 times before drilling
3. Hard bending and plastic coating can be processed according to clients’ special requirements

 
 


 
FAQ
 

Q: What is your delivery time?
A: It usually takes 20 days to produce. Within 3 days (if there is stock).
 
Q: How to control the quality?
A: Before shipping, we should check and test each drill rod.
 
Q: Do you agree to order samples?
A: Yes, we welcome your sample order to test our quality.
 
Q: Has your drill pipe been heat treated?
A: Yes, our heat treatment of drill pipe and casing.
 
Q: Does your drill pipe have anti-rust function?
A: Yes, each drill pipe and casing will be anti-rust with paint or anti-corrosion oil before transportation. If you need galvanized pipe, please contact us.
 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Langfang Baiwei Drill Co., Ltd.
Location Yongqing Industrial Zone, Langfang, Hebei, China
Contact Person Lily Gao

Request A Quote

Please check your email address.
Your message must be at least 20 characters.