Easy Assembly KD Structure 33 Door Metal Lockers 0.7mm Thickness Electrostatic
Easy Assembly KD Structure 33 Door Metal Lockers 0.7mm Thickness Electrostatic
| ITEM NO. | 3L-B11 |
| NAME | Easy Assembly KD Structure 33 Door Metal Lockers 0.7mm Thickness Electrostatic |
| STANDARD SUIT | Nothing inside |
| SIZE | W945*D460*H1830mm |
| PACKING VOLUME | 0.218cbm |
| MOQ | >30PCS |
| COLOR | Gray Color; RAL Color; Our Own Colors /Specified by the Customers |
| THICKNESS | Regular0.6mm;0.5-1.2mm offered |
| PACKAGING | Foam, EPE paper, Canton, Foam Paper |
| DELIVERY | About 15-36days |
| CERTIFICATIONS | ISO9001;ISO14001;ISO45001; ISO18001 |
| OUR SERVICE | OEM ODM |
| Warranty | 5 years |
| Payment Term | L/C at sight, Or 30% deposit TT in advance, 70% balance against finished the production. |
|
Advantages
|
1. Easily to assemble, save 30% time |
| 2. Steady construction, durable electrostatic powder coating | |
| 3. Waterproof, fireproof, collision resistance | |
| 4. Every product will go through 3 strict QC by our professional QC team | |
| 5. High efficiency and perfect after-sale services |

FEATURES
- Front frame knocked down a structure that could be assembled within 5-8mins
- The patent hinge, portable and steady
- Aluminum alloy handle, free replacement
- Typically color light grey, the color could be customized
- High-quality cold-rolled steel plate, the thickness of steel plate could be customized
- Lockset with high quality, kinds of style can be choose
- Two keys are included for each lock
- Assembled quickly and steady, instructions included
- Automatic electrostatic spray ensure the firmness and durableness of the coating
- Cabinet is packed in a single package
SUPPLY ABILITY AND TRADING TERMS
Terms of payment
- Payment term: T/T 30% deposit after order confirmed, the balance paid against copy BL or L/C at sight.
- Lead time: normally in 4 weeks after deposit received.
- Discounts: We offer discounts for big quantities.
- Sample product: Sample can be prepared before mass production. Samples can be ready in 7 days once payment received.
- Shipping port: Qingdao, China.
Lead-time
| Quantity(Pieces) | 1 - 500 | >500 |
| Est. Time(days) | 15~28 | To be negotiated |
APPLICATION
Office / Super Market/ School / Home / Hotel / Hospital / Company / Factory
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.









