PA66 76mm Busduct Outgoing Sheath Busbar Tap Off Unit For Conversion
Busduct Outgoing Sheath for Busbar Tap Off Unit for Conversion
Its used for the prevent the dust and Sundries entering the tap off unite
| Model | Hole Diameter | Max. Diameter for Wire |
| KD-KT4 | φ76mm | φ68mm |
| KD-KT3 | φ66mm | φ54mm |
Installation Guideline of Tap Off Unit (Plug-In Type)
There are two types of plug-in tap-off units :
1) Plug-in tap-off units without automatic clamping system .
2) Plug-in tap-off units with automatic clamping system.
Step 1: Open or remove the tap-off unit cover.
Step 2: Install the protection device in the tap-off unit.
Step 3: Remove the IP protection on the outlet of the run component.
Step 4: Prepare the output cable glands and connect the cables to the tap-off unit.
Step 5: Check that the protection device is switched off and carefully inspect the tap-off unit for tools and objects that may have been left inside the tap-off unit.
Step 6: Position the rear of the tap-off unit on the run component.
Step 7: Plug the tap-off unit into the run component.
Step8: Lock the tap-off unit on the run component using the locking handle located inside the tap-off unit
Step9: Secure the tap-off unit on the run component using the fixing mechanism.
Step10: Close the tap-off unit cover. The system and the load are ready to be energized.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
