Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Geological Drilling Bore Well Machine Rig Prospecting 300mm Diameter Gk 200

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-12 days
Brand: JINZHOU SHITAN
Product Description

Geological Drilling Rig Prospecting 300mm Diameter GK 200 Hydraulic Borewell Machine

 

 

GK 200 Geological Drilling Rig Introduction:

 

GK-200 Drilling Rig is a light multifunctional engineering project prospecting drilling rig

With the hydraulic feeding mechanism,improve the drilling efficiency,reducing the labor intensity of workers.

The rig is equipped with a ball on a cassette holding mechanism and a six side rod, the rod can be replaced without shutdown, high work efficiency, safe and reliableFurnished with hole bottom pressure gauge pressure indicator,and easy to master the status inside the hole

The handle centered, convenient operation.

 

GK 200 Geological Drilling Rig Technical Information:

 

Drilling depth 60 225 295m
Drilling diameter 300 76 46mm
Drill pipe diameter 50 42mm
Spindle Turnable Angle 0-360degree
Net weight(excluding the power machine) 670kg
Dimension(length*width*height) 1820*980*1400mm
Revolving Plate
Spindle speed 900 475 388 205 157 68 r/min
Maximum torque 2000N*m
Driving travel 400mm
Maximum Cylinder driving force 2,9000N
Maximum Cylinder lifting force 3,9000N
Lifter
Lifting capacity 3,0000N
Bobbin line speed (2 layers) 0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter 135mm

 

GK 200 Geological Drilling Rig Advantage:

 

Wide range if P.R.M and well-set gears

Great torque in low P.R.M, fit for coring drilling and piling hole works.

Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

Optimized structure, small volume, and lightweight.

1. The drill pipes/casing pipe will be packed into bundles as 3x3, 3x4, 4x4 etc, and loading into containers after black painting and thread protectors installation.

2. For 20’ container, the max loading weight is 21 metric tons

3. For 40’ container, the max loading weight is 27 metric tons.

4. Usual loading port is XINGANG port in Tianjin, main port in north of China.

 

Drilling Rig Applications
 
It is a survey method to find out the underground geological conditions. It can be divided into: (1) geophysical exploration: lithology, groundwater level, karst cave distribution, etc. are divided according to the conductivity, magnetism, density and the propagation speed of elastic wave in different underground strata and media (water, cavity, rock, etc.). Guide drilling. (2) Drilling: combined with pit (groove) exploration. 3) penetration: it is both an exploration method and an in-situ test method.
 

The specific steps of soil sampling method are as follows

 

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.