Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Gy 200 Portable Borehole Drilling Machine Crawler Mounted 400 Meters Depth

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-12 days
Brand: JINZHOU SHITAN
Product Description

Gy 200 Crawler Mounted Portable Borehole Drilling Machine 400 Meters Depth

 

 

GY 200 Hydraulic Borewell Machine

 

It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.

 

GY 200 Hydraulic Borewell Machine Technical

 

Drilling depth 60 225 295m
Drilling hole diameter 300 76 46mm
Pipe rod diameter 50 42mm
Spindle Turnable Angle 0-360degree
Net weight(excluding the power machine) 670kg
Dimension(length*width*height) 1820*980*1400mm
Revolving Plate
Spindle speed 900 475 388 205 157 68 r/min
Maximum torque 2000N*m
Driving travel 400mm
Maximum Cylinder driving force 2,9000N
Maximum Cylinder lifting force 3,9000N
Lifter
Lifting capacity 3,0000N
Bobbin line speed (2 layers) 0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter 135mm

 

GY 200 Hydraulic Borewell Machine Advantages

 

1.Wide range if P.R.M and well-set gears

2.Great torque in low P.R.M, fit for coring drilling and piling hole works.

3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

 

GY 200 Hydraulic Borewell Machine Application

 

1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.

1.1.2 geological core drilling and physical survey.

1.1.3 drilling of small grouting holes and blasting holes.

1.1.4 small water well drilling

 

How are the drill pipes in the well drill connected?

 

The water well drilling rig can be used only after all parts are firmly installed and connected before being used for drilling.

The following are the relevant operation steps of adding and connecting the drill pipe of the water well drilling machine:

Operation of well drilling machine when adding drill pipe

1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water;

2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation);

3. The rotator reverses, and at the same time, retracts the feed oil cylinder to rotate the water braid shaft away from the drill pipe;

4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly return to place;

5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.