Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Xy-2 Large Horsepower Crawler Drill Machine Exploration Borehole

Price Negotiable
Price: Negotiation
MOQ: Negotiation
Delivery Time: Within 7ays
Brand: ShiTan
Product Description

XY-2 Large Horsepower Exploration Borehole Crawler Mounted Drill Rig

 

XY-2 Crawler Mounted Drilling Rig Description

It is 400 meters depth,400 mm hole diameter,it is for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.With hydro-automatic feeding device, and high drilling efficiency.

 

XY-2 Crawler Mounted Drilling Rig Tech Data

 

Drilling Rig Swivel Head

Drilling depth

 

Max.300~400m

Spindle speed

 

60 105 165 228 235 405 638 880 r/min

Hole diameter

 

Max.600m Spindle stroke 550kmm
Drill rod diameter 42mm Spindle pull-down Max.50KN
Angle range 0°~360° Spindle lifting capacity Max. 37KN
Oil pump Water pump
Model YBC-20/125 Model Gear oil pump
Rated pressure 8Mpa Working pressure Max. 10Mpa
Flow speed 20ml/r    
Rated speed 150r/min    
Hoist Power(diesel)
Max. lifting capacity 212kgs Model(diesel engine ZS1115
Hoisting drum revolution 20.39.85.170r/m Rated power 18.5KW
Drum diameter 140mm Rated speed 1800 r/min
WEIGHT AROUND 980kgs
SIZE 2330x1050x1620mm

 

XY-2 Crawler Mounted Drilling Rig Advantages

 

1. With hydraulic automatic feeding mechanism, high drilling efficiency

2. The upper ball clamping mechanism is used instead of the chuck, which can realize the non-stop reverse lever

3. The handle is centralized, easy to operate, safe and reliable

4. Compact structure, drilling rig, water pump and diesel engine are all installed on the same chassis

5. Small footprint, light weight, strong decomposability, easy to relocate, suitable for various terrains such as plains and mountains

 

Shitan Machinery Drilling Rig Machines FAQ 

 

Q1.What is the main function of our drilling rig?
Ans.: It has different models used for all kinds of geological, it is the best choice for drilling hole station construction.
Q2. What is your terms of payment?
Ans.: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3.. How about your delivery time?
Ans.: Generally, it will take 7 -10 working days after receiving your advance payment.
The specific delivery time depends on the items and the quantity of your order.
Q4. What is the warranty of our machine?
Ans.:Our main machine enjoys a 1 year warranty(except for the hammer), during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.
Q5. Do you have any certificates for your machine?
Ans.: All of our produ c ts coming with the certificates of CE, ISO9001.

 

What is a soil sample investigation?

 

Soil investigation is to carry out physical testing on-site to understand the ground conditions for geotechnical design. Site works usually consist of the Cone Penetration Test, Vane Shear Test, Standard Penetration Test, Installation of Water Standpipe, Instrumentation's, etc.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.