Highly Automated Crawler Mounted Water Drilling Rig Easy Use
Price:
35000 USD-45000 USD
MOQ:
1 set
Delivery Time:
15-20 days
Brand:
Shitan
Product Description
Summary of tracked hydraulic drilling rig:
Operation process
The complexity of the operation process of a tracked down the hole drilling rig depends on the type of equipment, degree of automation, and operating scenario. From the perspective of standardized operating procedures, it includes multiple stages such as preparation, drilling, and relocation, which need to balance equipment control and safety regulations. However, after systematic training, skilled operators can efficiently complete their tasks
Technical Parameters:
| Product Name | Small 100 Meter Crawler Mounted Drilling Rig Machine |
| Drilling Depth | 30m-100m |
| After Sales Service | Online Support |
| Drilling Rod Diameter | 60 Mm |
| Weight | 1.5T |
| Color | Yellow, blue, red |
| Drilling Diameter | 50mm-100mm |
| Gas consumption |
3.5-5㎡/min |
| Dimension |
2000mm*1200mm*1200mm |
| Drill pipe length | 1.5m |
application area
Mining: Used for drilling operations in open-pit and underground mines, such as mining stone, coal, etc., which can drill blasting holes, anchor holes, anchor holes, etc.
Water conservancy and hydropower engineering: It can be used for drilling, grouting, anchoring, drainage and other operations in dam construction, reservoir reinforcement, water diversion tunnels and other projects.
Transportation Engineering: Suitable for drilling operations in roadbed reinforcement, slope protection, tunnel construction, and other aspects of highway and railway construction, such as drilling anchor holes, anchor holes, and pipe shed holes.
Building foundation engineering: In high-rise buildings, bridges, ports and other foundation engineering, it can be used for drilling and grouting piles, foundation reinforcement, anti floating anchor rods and other construction.
Geological exploration: used for drilling and sampling, geological structure detection, and other work in the field of geological exploration, to help understand the underground geological conditions.
summarize
The impactor of a tracked down the hole drilling rig achieves rock fragmentation through a mechanism of "pneumatic drive piston impact energy transfer", and its performance directly determines drilling efficiency and cost. Understanding its working principle and maintenance points is helpful for precise selection and troubleshooting in mining, infrastructure, and other engineering projects, fully leveraging equipment efficiency. In practical applications, it is necessary to match the impactor model according to the rock type and extend the life of the core components through standardized maintenance.





Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jinzhou City Shitan Machinery Equipment CO. LTD.
Location
Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person
cathy