Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

200m Rural Drinking Water Well Drilling Rig Easy Operation And Portable

Price Negotiable
Price: 35000 USD-45000 USD
MOQ: 1 set
Delivery Time: 15-20 days
Brand: Shitan
Product Description
200m Rural Drinking Water Well Drilling Rig Easy Operation and Portable 
This portable and easy-to-operate water well drilling rig is designed for efficient water well construction in rural and agricultural settings.
Product Overview
A complete mechanical system for drilling water wells and performing supporting operations including well casing, washing, and cementing. Ideal for rural drinking water, farmland irrigation, industrial water supply, ground source heat pump holes, and precipitation wells.
Technical Specifications
Parameter Value
Model ST 200
Max Drilling Depth 200m
Drilling Diameter 105-350mm
Air Pressure 1.2-3.5 Mpa
Rod Length 3m
Rod Diameter 76-89mm
Main Shaft Pressure 4T
Lifting Force 18T
Power Head Stroke 40m
Max Rotary Torque 5900 Nm
Max Rotary Speed 30-120 r/min
Secondary Winch Lifting Force 1T
Jacks Stroke 1.35m
Moving Speed 2.5 km/h
Uphill Angle 21°
Weight 5.5T
Engine Xidong 65kw
Overall Dimensions 4400*2150*2200mm
Working Condition Loose layer and bedrock
Core Features
  • Impact-based drilling with rotation support delivers 3-5 times higher efficiency in hard rock compared to ordinary rotary drills
  • Excellent performance in hard formations including granite and basalt
  • Air-based drilling medium eliminates mud pollution for cleaner wells and better water quality
  • Minimal hole wall disturbance ensures stability in complex formations and mountainous areas
  • Simple equipment structure with few fault points for easy field maintenance
Work Process
  1. Power transmission: Engine-driven rotation and feeding of drilling tools
  2. Stratum fragmentation: Drill bit breaks rocks or soil through cutting and impact methods
  3. Slag discharge: Mud pump maintains hole stability by removing drilling debris
  4. Well completion: Casing and cementing to form usable water wells
Product Images
Water well drilling rig in operation at a rural site
Drilling rig setup for agricultural irrigation well
Drilling rig operator control panel
Water well drilling rig equipment
Completed water well installation
Water well drilling rig components

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.