Water Seeking Project in Rural Area Depth Portable Water Well Drilling Rig Machine
Water Seeking Project in Rural Area 150m Depth Portable Water Well Drilling Rig Machine
Product Application:
ST-150 made by JINZHOU SHITAN is widely used in the construction of projects like prospecting,railway,road port,bridge,water conservancy and hydropower,tunnel,well, industrial and civil construction,geological exploration,large diameter boring pile and small diameter diamond core deep hole drilling ,etc.
Product Parameter:
| Basic Parameters | |
| Drilling Depth | 150 100 20 m |
| Drilling Hole Diameter | 46 76 300 mm |
| Drill Pipe Diameter | 42mm |
| Gross Weight Of Drilling Machine | 450kg |
| Dimension L*W*H | 1580*1080*1200 mm |
| Revolving Plate | |
| Rated Speed | 48 100 200 350 650 r/min |
| Maximum Torque | 2000N*m |
| Maximum Cylinder Driving Force | 20,000N |
| Maximum Cylinder Lifting Force | 30,000N |
| Lifter | |
| Lifting Capacity Single Pipe, Low Speed | 15,000N |
| Bobbin Line Speed | 0.32 0.66 1.24 2.58 m/s |
| Bobbin Diameter | 140 mm |
| Rope Diameter | 11 mm |
| rope capacity | 24 m |
| drilling tower | |
| type | Staircase Tower(or Steel Pipe tower) |
| height | 6m |
| Power machine | |
| type | Changchai ZS1100 Diesel engine |
| rated power | 12.1 kw (16HP) |
| weight | 150kg |
Main Features
2,It can be achieved without stopping to change rods, easy to operate, safe and reliable with ball clip holding mechanism or hydraulic chuck.
3, It has hole bottom pressure gauge to be easy to master the situation in the hole.
4, It also has advantage of Compact structure, concentrated handle, small footprint, light weight, strong decomposition, easy to move. It can be operated in plains and mountain areas.
What should be paid attention to during the operation of the drilling rig?
a. When engaging the clutch or rotating the working wheel, it must be light, uniform and stable;
b. When changing the speed, engaging the horizontal and vertical axle boxes and changing each transfer handle, the clutch must be placed at the separation position or the work wheel must be stopped;
c. When using the lift, it is forbidden to press down the left and right handlebars at the same time;
d. After the gear oil pump is started, pay attention to the response of the oil pressure gauge and the hole bottom pressure indicator. During the drilling process, when the pressure at the hole bottom needs to be increased or decreased, it shall be adjusted gradually, and sudden increase or decrease is not allowed; When using the oil pressure system to quickly lift the vertical shaft (fast reversing rod), it is only allowed to carry out under the original load to prevent damage to the parts;
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




