Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Exploration Mining GK 200 Crawler Mounted Drill Rig For Borehole Drilling

Price Negotiable
Price: Negotiation
MOQ: Negotiation
Delivery Time: Within 7-12 days
Brand: ShiTan
Product Description

Exploration Mining GK 200 Crawler Mounted Drill Rig 

 

 

Product Description

 

This is mainly a collection of functions and features of the popular market XY-1, XY-1B, XY-1A other small rigs.It is a light larger torque rotary rigs which uses XY-1 hydraulic automatic infeed, a wide range of large modulus gear transmission of XY-1B's, XY-1A Wide range speed. Suitable for geological survey and prospecting, exploration roads and building exploration , high-speed grouting detection hole, blast hole, small wells, small pile hole drilling, etc. 

 

Product Specifications

 

Drilling depth

m

200

Drilling Diameter

mm

300

Open hole Diameter

mm

300

End hole Diameter

mm

75

Drilling rod

mm

Φ50

Drilling angle

 

90°-75°

Spindle forward speed

r/min

71, 142, 310, 620

Spindle stroke

mm

450

Main Winch ( drive hydraulic system)

Single line lifting capacity

kn

25

Reel speed

r/min

20, 40, 90, 180

Reel diameter

mm

140

Wire diameter

mm

9.3

Wire capacity

m

40

Hug floodgate diameter

mm

278

Hug floodgate belt width

mm

50

Mud pump

 

BW-160

Mud pump flow

L/min

160

Mud Pump liner diameter

mm

100

Piston diameter

mm

100

Rated working pressure

Mpa

1.3

Max working pressure

Mpa

2.0

Triangle belt

 

B1350

Oil pump

 

F320

Flow

L/min

20

Pressure

Mpa

20

Triangle belt

 

B900

Diesel engine

 

S1115 22 HP

Dimension

mm

2400*950*1300mm

Weight

kg

870

 

Product Advantages

 

This hydraulic water well drilling rig is simple,should be equipped with mud pump to works,main used for family and farm water well drilling,it main suitable for soil geology,also can drill soft rock,this water well drilling rig has different chassis,can add wheels,also can change with crawler chassis,if you want to move it far,can add it on a truck,we are factory,so we can accept customized,please contact us for more information.

 

Daily maintenance:

 

1. The motor part of the drill should be handled with care to avoid rain and splash.

2. Motor wire connector shall not touch to connect with electricity.

3, often check whether the wire rope replacement.

4.Check the connection of each part of the oil pipe, whether there is oil leakage and whether the oil level is normal.

5, before and after the use of the drill pipe wire head with oil lubrication placed in the rain shelter, so as to avoid rust.

6. The motor shall not be overloaded for a long time.

7. Check the circuit and transformer insurance when the motor does not work.

8. It is strictly prohibited to continuous pressure the cylinder when it rises or falls to the end position of the stroke.

9. During the period when the drilling machine is not in use, the water in the water injector and the water pump shall be drained in time, and the connection with the drilling machine shall be disconnected and stored separately.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.