OEM 400m 2.5km/H Crawler Mounted Drill Rig
Price:
Negotiation
MOQ:
1 Set
Delivery Time:
Within 7-12 days
Brand:
ShiTan
Product Description
OEM 400m 2.5km/H Crawler Mounted Drill Rig
| Attribute | Value |
|---|---|
| Type | Water well, civil construction, soil testing |
| Color | Red Yellow |
| Feature | High Drilling Efficiency |
| Usage | Water Well |
| Drilling diameter | 400m |
| Origin | Hebei, China |
| Weight | 10 MT |
| Power type | Diesel, Electric |
| Condition | New |
| Warranty | 2 Years |
Hot selling OEM customized high speed water well drilling rig/ ST 350 Crawler Mounted Drill Rig
OEM customized drilling machines ST 350 Crawler Mounted Drill Rig Application
OEM customized drilling machines ST 350 Crawler Mounted Drill Rig is suitable for water well drilling, exploration, geophysical road and building exploration and blasting hole drilling engineering, etc. It can be selected according to the underlying different alloy, diamond, compact drill for drilling, etc.
OEM customized drilling machines ST 350 Crawler Mounted Drill Rig Specifications
| Drilling depth | 400m |
| Drilling diameter | Φ140-Φ350mm |
| Working air pressure | 1.7-3.5MPa |
| Air consumption | 17-30m³/min |
| Drilling pipe diameter | Φ89, Φ102mm, Φ108mm |
| Length of drill pipe | 1.5m, 2.0m, 3.0m, 6.0m |
| One push length | 6.6m |
| Tramming speed | 2.5km/h |
| Climbing ability (Max.) | 30° |
| Ground clearance (Min.) | 250mm |
| Rotation speed | 45-115 rpm |
| Rotation torque | 6500-9000 N.m |
| Power | 92 Kw |
| Weight | 10 MT |
| Dimension | 5900x2100x2850mm |
Attentions in Drilling Process Of ST 350 Crawler Mounted Drill Rig
- After drilling structure of crawler drill bit, the center drilling tool needs to be replaced in time. Firstly, the hole bottom needs to be cleaned, and then the residue at the bottom of the hole is blown clean. After the bit stops rotating, the drilling tool in the drilling rig is slowly lifted up. When the lifting force is good enough to lift the drilling tool, it is appropriate.
- When the drill bit of crawler drilling rig is summarized in the drilling process, it is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and timely keep the hole clean when necessary, and the drill bit in the drilling rig is not allowed to pull out forcefully during the drilling process.
- Sometimes more residual rock slag will be left at the bottom of the hole of crawler drilling rig, and the rotary part of the eccentric bit will be blocked by the rock slag, which will affect its closing production. At this time, it is necessary to transport compressed air, clean the hole again, and make the DTH hammer work for a short time, and then lift the central drilling tool again.
After-sales service
- New machine provides technical training.
- Once anything goes wrong with the machine by normal using, our technical person will be with you ASAP.
- When the machine should be maintained, you will receive the reminding from us.
- According to different geological conditions, we will recommend different construction plans for you.
- Remind you which are wearing parts, so you can get a good preparation.
- 7*24 hours online service (wechat, whatsapp, email, phone).
- Other customer's reasonable requirement.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jinzhou City Shitan Machinery Equipment CO. LTD.
Location
Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person
cathy