Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

24 Months Warranty 55kw 180m Crawler Drilling Rig 2.5km/H

Price Negotiable
Price: Negotiable
MOQ: 1set
Delivery Time: 5 days after payment
Brand: ST
Product Description
55 KW Custom Drilling Rigs ST-180 Meters Crawler Mounted Borehole Drilling Machine
 
 
ST 180 Meters Pneumatic Borewell Drilling Machine Introduction
 
ST 180 Meters Pneumatic Borewell Drilling Machine is a newly-developed multifunctional hydraulic driller, it is highly efficient and energy saving. In practice, it is mainly used for dig water well, monitoring well, geothermal air-conditioner hole, and anchoring hole, especially the groundwater exploiting projects.

 

ST 180 Meters Pneumatic Borewell Drilling Machine Techical Data

Model
ST180 ST 180 Meters Pneumatic Borewell Drilling Machine
Drilling hole diameter
140-254mm
Drilling depth
180m
One-time advance length
3.3m
Walking speed
2.5km/h
Climbing angles (Max.)
30
Equipped capacitor
55kw
Using air pressure
1.7-2.5mpa
Air consumption
17-31m³/min
Drill pipe length
1.5m, 2.0m, 3.0m
Drill pipe diameter
76mm, 89mm
Rig lifting force
12t
Swing speed
45-65rpm
Swing torque
3200-4600(N.m)
Dimension
3800*1500*2200mm
Weight
4500kg

 

Custom Drilling Rigs ST-180 Meters Crawler Mounted Borehole Drilling Machine​ Fetures

 

1.Compact design for easy use
2.180 meters drilling and 30m/h drilling speed
3.Track all terrain chassis ,durable and stable .
4.Double hydraulic power head more powerful ,the drill speed faster and drill diameter more big .
5.High power engine and integrated operation.
 
Custom Drilling Rigs ST-180 Meters Crawler Mounted Borehole Drilling Machine Attentions

 

1. Geological: before drilling to understand the types and distribution of geological, is the main geological strength, can is informed by geological report and core sampling geological limit bearing capacity, and the underground water level and deep pile diameter pile, etc., only after we fully understand the geology, mud to modulation, equipped with drill pipe drilling tool and tooth, using the appropriate operating mode.

 

2. Mud: the mud protects the drilling rig and ensures the quality of hole formation. After understanding the geological report, the mud is prepared according to the type and distribution of the ground quality and in combination with the geological strength and Party A's requirements.

 

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.