Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

ST 350 Meters Depth 92kw Diesel Engine OEM Crawler Mounted Drill Rig

Price Negotiable
Price: workable
MOQ: 1 set
Delivery Time: 10-15 days
Brand: ShiTan
Product Description

ST 350 Meters Depth Drilling Machine 92kw Diesel Engine Crawler Chassis Mounted Drilling Rig

 

 

ST 350 Crawler Chassis Mounted Drilling Rig Descrption

 

ST 350 Pneumatic Drilling Rig Machine is is equipped with powerful hydraulic rock drills that offer high penetration rates, reliability, and excellent fuel economy. These diesel-powered rigs represent the industry's leading range, from lightweight rubber-tire drills to the most powerful production drills available. ​

 

ST 350 Crawler Chassis Mounted Drilling Rig Technical Information

 

Model
ST 350 Pneumatic Drilling Rig Machine
Drilling depth
350m
Dia.hole
φ140 - 325mm
Advance Length one time
6.6m
Working pressure
1.7-3.3MPa
Air consumption
17-35m³/min
Length of rod
1.5m,2m,3m, 6m
Dia. Of rod
φ89,φ102,φ114
Lifting power
24T
Rotation torque
6200-85000N.m
Rotation Speed
55-115r/min
Diesel Engine
Yuchai
Engine Power
92Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity
30°
Weight
9000kgs
Dimension
5900x2000x2850mm
Application
Complicated geological conditions: Rock, Mud, Sand etc.
 
ST 350 Crawler Chassis Mounted Drilling Rig Features 
 
Multifunctional drilling. Various drilling techniques can be used on this drill, such as down the hole drilling, mud drilling, cone drilling, pipe following drilling and core drilling under development. The drilling rig can be equipped with mud pump, generator, electric welding machine and cutting machine according to the needs of users. The drilling rig is also equipped with various hoists as standard.

 

ST 350 Crawler Chassis Mounted Drilling Rig Working Attentions

 

When shipping the water well drilling rig, safety inspection shall be carried out. All parts of the drilling rig shall be complete, and the cable shall be free of electric leakage, drill pipe and drilling tool. When entering the construction site, the rig tower shall be fixed, the area of the drilling site shall be larger than the rig base, and there shall be enough safety space around.

The drilling rig for water wells shall be constructed in strict accordance with the hole position, orientation, angle and hole depth, and the driller shall not change it without authorization. When installing the drill pipe, check the water well drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.