Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Rotary Motor Power 220v Water Well Boring Machine

Price Negotiable
Price: Negotiation
MOQ: Negotiation
Delivery Time: Within 7-12 days
Brand: ShiTan
Product Description

Water Well Drilling Machine Oil Drilling Rig Machine Rotary Drilling Rig Machine

 

 

GK 200 Soil Testing Drilling Rig Introduction

 

GK 200 General geological survey exploration, road and high-rise building foundation exploration, various concrete structure inspection holes, river embankments, subgrade grouting hole drilling and direct grouting, civil water wells and ground temperature central air conditioning, etc.

 

GK 200 Drilling Rig Technical Data

 

GK200  parameter
Drilling depth 200m
Drilling caliber 200mm
Drill rod caliber 50mm
Drilling angle 90°~75 °
Drill weight (No include power) 510kg
Spindle
Spindle speed 64 128 287 557 r/min
Spindle stroke 450mm
Hoist
Max.single line hoisting capacity 2400kg
Reel lifting speed 0.41 0.82 1.64m/s
Tightrope caliber 12.5mm
Tightrope cubic measure 35mm
Hug floodgate caliber 260mm
Hug floodgate belt width 70mm
Distance between drill and hole 450mm
Mud pump
Type Horizontal single urn twin action
Displacement 170L/mim
Power
Diesel engine S1115 15HP
Electric motor Y160M-4 11kw 1440r/min
Maximum pressure 3Mpa
Work pressure 1.5Mpa
Water inlet caliber 40mm
Water to exit caliber 30mm
Triangle conveyer belt B1728mm

 

PRODUCT FEATURE

 

1. The hoist is equipped with a cage to form a double-sided supporting star wheel structure, which can withstand strong impacts;

2. The four sets of bearings in the vertical axle box are positioned to ensure that the gyrator has sufficient rigidity to deal with complex geological conditions such as gravel and pebble layers;

3. This machine adopts the taper clutch of national patent technology, which has the outstanding characteristics of large transmission torque, convenient operation and maintenance-free;

4. It adopts 53×59 hexagonal active drill pipe, which has strong rigidity and large transmission torque.

 

Precautions during assembly and disassembly of coring rig:

 

a. During component disassembly, the locating pin shall be removed first and then other disassembly work shall be carried out. During installation, the locating pin shall be installed first after the position is aligned, and then other parts shall be installed.

b. Protect the joint when removing the oil pipeline.

c. The disassembly times of oil pipeline joints shall be minimized to avoid oil leakage.

d. During disassembly and installation, it is forbidden to strike the casting with force. When it is necessary to strike other accessories, wooden blocks or red copper blocks shall be padded

e. Before installation, the parts shall be cleaned with kerosene and coated with sufficient lubricating oil (or grease). The powder metallurgy shaft sleeve shall be carried out according to the provisions in the section of "use and maintenance".

f. Replace damaged or worn parts

g. When installing the diesel engine, pay attention to check the coaxiality of the crankshaft and the worm.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.