Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu
Machinery Agricultural Machinery & Equipment Other Agricultural Machinery & Equipments

200m Deep Drilling Equipment Manufacturers For Geological Exploration

Price Negotiable
Price: Negotiation
MOQ: 1 set
Delivery Time: 7-12 days
Brand: JINZHOU SHITAN
Product Description
GY-200 Geotechnical Exploration 300 Meters Depth Soil Test Drilling Machine
Product Specifications
Attribute Value
Product Name GY-200 Geotechnical Exploration 300 Meters Depth Soil Test Drilling Machine
Type Core Drilling Rig
Power Type Diesel
Usage Water Well
Certification CE ISO
Warranty 1 Year
Drilling Depths 300 Meters
Drilling Hole Diameter Customized
OEM Acceptable
Drilling Angle 90°~75°
Technical Parameters
Parameter Value
Drilling Depth 50-300m
Max Open Hole Caliber 300mm
Motor power 20 (kw)
Borehole diameter 75-300 (mm)
End Hole Caliber 75mm
Drilling Rod Diameter 60mm
Drilling Angle 90°~75°
Drill Rig Moving Stroke 300mm
Power Diesel engine 22HP
Spindle Speed 64 128 287 557 r/min
Spindle Stroke 450mm
Max.Single Line Lifting Capacity 2400kg
Max.Single Line Lifting Speed 0.41 0.82 1.64m/s
Wirerope Caliber 13mm
Mud Pump Diesel 170L/min
Work Pressure 1.5Mpa
Water inlet pipe diameter 40mm
Water outlet pipe diameter 30mm
Primary Applications
  • Mineral deposit survey and exploration, particularly for nonferrous and rare metals, including deposit tracing, geological structure exploration, ore body delineation, sampling and verification
  • Mine excavation applications including underground observation holes, ventilation holes, drainage holes, gas drainage holes, grouting holes, blasting holes, anchor holes and pilot holes for tunnel digging
  • Geotechnical engineering applications including dam foundation slope reinforcement, geological disaster treatment, deep foundation pit support, and various industrial, commercial, traffic and  underground construction
  • Building foundation construction for structures including workshops, high-speed railways, highways and other rock foundation projects
Transportation Guidelines
For safe transportation of the water well drilling rig, please observe these important guidelines:
  • Select a flat location for loading and unloading operations
  • Use specialized unloading platforms during transport operations
  • Ensure an assistant is present to guide operations and restrict access to unauthorized personnel
  • After loading: lower the suspension rod to its lowest position, engage the hand brake, put in reverse gear, remove the start key and turn off the main power switch
  • Secure all four tires with wire restraints and wedge them firmly with blocks
  • Adjust or remove rearview mirrors as needed to prevent damage
  • Exercise caution when crossing culverts and bridges, watching for clearance issues
  • When unloading: release the hand brake, engage forward gear and proceed at minimum speed
Product Images
GY-200 Drilling Machine front view GY-200 Drilling Machine side view GY-200 Drilling Machine operational view GY-200 Drilling Machine close-up of drilling mechanism GY-200 Drilling Machine transport configuration GY-200 Drilling Machine control panel detail GY-200 Drilling Machine in field operation GY-200 Drilling Machine drilling assembly GY-200 Drilling Machine power unit detail

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.