Jinzhou City Shitan Machinery Equipment CO. LTD.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

St 300 Borewell Drilling Machine Steel Crawler Mounted Commerical Water Well

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 7-10 days
Brand: ShiTan
Product Description
ST 300 Borewell Drilling Machine - Steel Crawler Mounted Commercial Water Well Equipment
Product Specifications
Attribute Value
Product Name ST 300 Steel Crawler Mounted Commercial Water Well Borewell Machine Equipment
Drilling Depths 300 Meters
Place Of Origin China (Mainland)
Model Number ST-300
Voltage Customizable
Certification ISO, CE, SGS, TUV, BV
Open Hole Caliber 75mm
Warranty 1 year
Material Steel
Condition New
OEM Customized Drilling Rig
Color Yellow, Red
Product Overview

The ST 300 drilling rig is an efficient and multifunctional borewell machine with 300 meters drilling depth and 300mm hole diameter capability. Designed for commercial water well applications, it excels in mountainous terrain and rocky strata conditions.

Technical Parameters
Model ST 300
Dimension 5900×2000×2850mm
The hole diameter 140-325mm
Drilling depth 300m
One-time advance length 3m
Walking speed 2.5KM/H
Climbing angles 30°
Power 84KW
Using air pressure 1.7-3.3MPA
Air consumption 17-35 cubic meter/min
Drill pipe length 2 meter or 3 meter
Drill pipe diameter 102mm, 89mm
Rig lifting force 20T
Swing speed 55-115rpm
Swing torque 6200-8500N.m
Key Features
  • Hydraulic technology with high torque hydraulic motor rotation
  • Large bore hydraulic cylinder push system
  • Multi-cylinder engine from renowned manufacturers
  • Capable of drilling in various geological conditions
  • Borehole diameter up to 245-294mm
Geological Layer Solutions

When encountering different geological layers during drilling, specialized methods ensure optimal results. For gypsum layers, calcium removal techniques using soda ash and viscosity reducers maintain drilling efficiency. The system adapts to various strata including quicksand layers with appropriate countermeasures.

Operation Method

The drilling rig operates using reverse circulation with a mud pump system. Circulating fluid flows from the sedimentation tank to the well bottom through the annular gap, while the rotary table drives the drill pipe and bit. Negative pressure created by the mud pump removes debris through the drill pipe's inner cavity, completing the efficient reverse circulation process.

ST 300 Borewell Drilling Machine - Front View
ST 300 Borewell Drilling Machine - Side View
ST 300 Borewell Drilling Machine - Operation View
ST 300 Borewell Drilling Machine - Detailed Components

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jinzhou City Shitan Machinery Equipment CO. LTD.
Location Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Contact Person cathy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.