OEM And ODM PEEK LKM Base Printer Parts Mold
Price:
Negotiate
MOQ:
1 mold
Delivery Time:
20 days after 2D 3D confirmed
Brand:
GT
Product Description
|
Mold base
|
LKM, DME, HASCO etc
|
|
Mold cavity and core steel
|
P20, LKM738, H13, S416, 1.2083,1.2085, 1.2311,1.2312,1.2343ESR, 1.2767, NAK80, etc.
|
|
Plastic material
|
ABS, ASA, PA-60GF, PBT, PC,PC/ABS, PE,PEI, HDPE, PMMA, PPS, PEEK, etc.
|
|
Hot runner
|
Moldmaster, Incoe, Yudo, Heitec, Gunther, Synventive, etc.
|
|
Hydraulic cylinder
|
Parker, AHP, HPS and so on.
|
|
Mold steel tolerance
|
+/-0.05mm
|
|
Standard parts
|
DME, Hasco, ect.
|
|
Mold life
|
1,000,000 shots
|
|
Plastic injection moulding machine
|
Horizontal, Vertical
|
|
Custom
|
Custom manufacturing according to customer's drawing or samples
|
|
Plastic parts
|
Poly bag, 5-layer carton box
|
1). Professional mold design as the production mould standards
2). Professional mold assembly staff with over 15 years experience
3). 2-shift fast manufacturing with CMM testing for each machining processes
4). Clear project schedule plan and on time delivery
5). Professional project management with efficient communication to make every minutes counts.
China Manufacturer Customize Plastic Injection Mold
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex,moldflow report will be present as well.
4. In house mold making shop ensure you mold quality under well control.
5. Normally it takes 20-40 days to make mold,precise time depends on part design.
Detail Information of Mould Steel
|
Mould material
|
mould hardness
|
mould life
|
|
P20
|
HRC 29-33
|
300000 shot
|
|
738H
|
HRC 32-36
|
300000 shot
|
|
718H
|
HRC 32-36
|
300000 shot
|
|
S136
|
HRC 48-52
|
1000000 shot
|
|
NAK80
|
HRC 38-42
|
500000 shot
|
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
TAKDA PRECISE MOULD FACTORY
Location
103, 1st Floor, Building A, Jinfeng Industrial Park, No. 8 Songlin West Road, Zengtian, Xin'an Community, Chang'an Town, Dongguan City, China
Contact Person
weili
