Anping County Hengquan Metal Wire Mesh Products Co.,Ltd
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu

50KN PP Biaxial Plastic Geogrid For Railway

Price Negotiable
Price: Deliberation
MOQ: 1000m2
Delivery Time: 5-8 days
Brand: Hengquan
Product Description

 

Railway And High Way Bed Stabilization Area And Ground Stabilization PP Biaxial Plastic Geogrid

 

Biaxial Plastic Geogrid Introduction

 

Biaxial geogrid is made of Polypropylene resin as its raw material, ,it is produced through the process of extruding, punching, heating, longitudinal stretching and transverse stretching.

Main type: 15-15KN, 20-20KN, 25-25KN, 30-30KN, 35-35KN, 40-40KN, 45-45KN, 50-50KN

Width:1-5.95 meter

Longth: 50 meters

Colour: black, gray, green

 

Biaxial Plastic Geogrid Specification

 

project TGSG15-15 TGSG20-20 TGSG25-25 TGSG30-30 TGSG40-40 TGSG45-45 TGSG50-50
Longitudinal tensile yield force KN/m 15 20 25 30 40 45 50
Transverse tensile yield force KN/m 15 20 25 30 40 45 50
Tensile Strength @2% Strain KN/m 5 7 9 10.5 14 16 17.5
Tensile Strength @5% Strain KN/m 7 14 17 21 28 32 35
Roll width 3.95 or 5.95 meters
Roll Length 50 meters
Features 1. Increase the bearing capacity of the roadbed and foundation and prolong their service life.
2. Prevent road surface and foundation from sinking or flawing, keep clean and beautiful ground surface.
3. Convenient construction saves time and labor, reduce mounting time and decrease maintenance expense.
4. Prevent culverts from flawing.
Function

1. It can be applied in all kinds of roads, railways, airports to enhance the roadbed.

2. It can be applied in a large car park and terminal freight yard, etc. to strengthen the foundations of a permanent load;

3. It can be applied in rail, road slope's protection;

4. It can be applied to enhance the culvert

 

Biaxial Plastic Geogrid Precautions

  1. The turning or braking of vehicles on the geotextile should be avoided as far as possible, especially when paving the asphalt surface course, any sharp turning or car killing sliding may bring up or damage the geotextile.
  2. Construction under rainy, humid or cold weather conditions will affect the bonding strength and overlay effect of the coating.
  3. Traffic must be closed during laying. Except for construction vehicles, other vehicles are allowed to pass through the geotextile only in case of emergency.
  4.  If there is slippage of paver when paving hot mix asphalt mixture, a small amount of stone chips can be sprinkled on the surface of tack coat oil.
  5. Generally speaking, when we master the construction points of geotextile skillfully, we can make it play a greater economic benefit and make greater contribution to our urban construction.

 

Biaxial Plastic Geogrid Advantage

  1. The good air permeability and water permeability of geotextile are used to make the water flow through, thus effectively retaining the loss of sand.
  2. Geotextile has good water conductivity. It can form drainage channel inside soil and drain excess liquid and gas from soil structure.
  3. It can effectively diffuse, transfer or decompose the concentrated stress to prevent the soil from being damaged by external force.
  4. Prevent the upper and lower layers of sand and gravel, soil and concrete mixing.
  5. High water permeability - good water permeability can be maintained under the pressure of soil and water.
  6. Corrosion resistance - polypropylene or polyester fiber and other chemical fibers as raw materials, acid and alkali resistant, corrosion-free, moth free, antioxidant.
  7. Simple construction - light weight, convenient use and simple construction.

Construction technology requirements


The paving surface of geogrid should be relatively flat. After the acceptance of the paving layer, in order to prevent the longitudinal deflection, first draw a white line or hang a line on the paving layer according to the width, and then start paving. Then fix the end of the geogrid with iron nails (8 nails per meter wide, fixed at an even distance).


After fixing the end of the grid, use the paver to slowly pull the grid forward, and manually tighten and straighten the grid every 10 meters long until one roll of grid is paved, and then lay the next roll. The operation is the same as before.


After a roll is paved, it can be rolled by 6t-10t roller from the starting point to the forward direction. (if it is paved on the middle surface course and the leveling layer, it is better to use the steel roller roller; if the grid is directly laid on the concrete pavement, the rubber roller is suitable.)


Joint paving: take the roll length as the unit of laying section length. After the grid should be laid within the section length, the overall paving quality shall be checked once again, and then the next section shall be paved. When the next section is paved, the overlapping length of the grid and the grid can be 10-15cm, and the second section can be paved in the forward direction after it is fixed with iron nails or wooden wedges. By analogy, the operation requirements are the same as before

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Anping County Hengquan Metal Wire Mesh Products Co.,Ltd
Location North 1000 meters, Taicheng village, East Huangcheng town Anping County, Hengshui City, Hebei Province, China
Contact Person ruby

Request A Quote

Please check your email address.
Your message must be at least 20 characters.