Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

DELLOK Aluminum Extruded Fin Tube Making Machine with 2.31-6mm Pitch and 8-16mm Height Range for Heat Exchangers

Price Negotiable
Price: 1 set $8,000.00
MOQ: 1 set
Delivery Time: 1-3 weeks
Brand: Dellok Yonghui
Product Description
Professional Aluminum Extruded Fin Tube Manufacturing Equipment

DELLOK specializes in advanced aluminum extruded fin tube making machines designed for high-efficiency heat exchanger production. With 20 years of industrial expertise, we provide comprehensive heat transfer solutions for diverse applications.

Industrial Applications

Our machines serve multiple industries including metallurgy, food processing, petrochemical, pharmaceutical, beverage production, wastewater treatment, refrigeration, power generation, paper manufacturing, building heating, and mining operations.

Technical Specifications
Parameter Specification Range
Fin Pitch 2.31-6mm
Fin Height 8-16mm
Fin Thickness 0.35-5mm
Base Pipe Range 16-50.8mm carbon steel
Tube Thickness 1mm and above
Fin Types & Material Compatibility
  • L Type, Double L Type, KL Type, G Type Fin Designs
  • Compatible with MS, Stainless Steel, Galvanized Iron, Copper, Aluminum materials
DELLOK Aluminum extruded fin tube making machine overview DELLOK fin tube machine technical specifications diagram DELLOK aluminum fin tube manufacturing process demonstration DELLOK fin tube machine product advantages illustration
Manufacturing Capabilities
  • 18,000 square meter production facility with advanced CNC equipment
  • Multiple professional certifications and patents obtained
  • OEM manufacturing and custom design services available
  • Global trade partnerships with comprehensive after-sales support
Frequently Asked Questions
Are you a trading company or manufacturer?

We are a direct manufacturer with full production capabilities and accept OEM orders. Factory visits are welcome for quality verification.

Can I request a sample?

Yes, sample orders are available for quality testing. Mixed samples from different product lines are also acceptable.

What is your production lead time?

Sample production typically requires 1-3 days, while mass production takes 15-30 days depending on specific requirements.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.
Location No.18 Tianyue Road,Yanzhou,Jiangsu China
Contact Person Peter Cheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.