DONGGUAN MISUNG MOULD STEEL CO.,LTD
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

UT Test Forged SKT4 Round Ring Hot Work Tool Steel

Price Negotiable
Price: USD 1.5-3/KG
MOQ: 20 TONS
Delivery Time: 20-50 DAYS
Brand: takford
Product Description

100% UT Test Forged Production SKT4 Tool Steel Round Ring For Hot Die

 

SKT4/ 1.2714 / 5CRNIMO steel has good toughness, strength and high wear resistance.Its mechanical properties are almost the same at room temperature and at 500 ~ 600℃.When heated to 500℃, the hardness of HB300 can still be maintained

 

Hardness

 

Annealing,241 ~ 197HB, indentation diameter 3.9 ~ 4.3mm

Heat treatment specification and metallographic structure:

Heat treatment specification: quenched, oil cooled at 830 ~ 860℃.

Delivery status: steel is delivered in annealed condition.

 

Application:

Suitable for manufacturing complex shapes, large impact load, low working temperature, side length & GT;400mm large and medium-sized hammer forging die and edge cutting die.For manufacturing simple shape general manufacturing process smelting use vacuum refining process to ensure the purity of steel;The e use of large-scale professional heat treatment to obtain the best pre-hardening effect of steel, hardness uniform distribution.

 

 

1.2714 steel Product Description

din 1.2714 steel of good price 1.2714
1.Specifications of din 1.2714 steel of good price 1.2714
Round bar Diameter(mm) Length (mm)  
20~800 3000~5800  

 

Plate

Thickness(mm) Width (mm) Length (mm)
Max:800 205~810 2000~4000
The size can be customed
2.Chemical composition(%) of din 1.2714 steel of good price 1.2714
C Si Mn Cr Mo V Ni P S
0.50- 0.60 0.10- 0.40 0.65- 0.95 1.00- 1.20 0.45-0.55 0.07-0.12 1.50-1.80 0.03max 0.03max
Similar standards
AISI/SAE DIN W.Nr. JIS GB,YB
6F2 56NiCrMoV7

1.2713

1.2714

SKT4  5CRNIMO
3.Heat treatment of din 1.2714 steel of good price 1.2714

Isothermal annealing:

-Heat to 800°Cand hold at temperature for 1/2 h to 1 h;

-Furnace cooling to 670°Cand hold at temperature for at least 10 hours;

-Cool by 10°C/h to 630°C;

-Cooling in air.

Maximum hardness:≤240 HB

Stress relieving:

To be carried out after maching before the final heat treatment.

-Heat to 600-650°C, hold for 4-6 hours;

-Cooling in furnace to 300-350°C;

-Cooling in air

Hardening:

-Initial preheating to 350-450°C;

-Second preheating to 650-750°C;

-Heat to hardening temperature 860-890°Cand hold at temperature;

-Cooling in hot oil (40-60°C); Tempering hardness: 45~45HRC

Tempering:

Tempering must be carried out within one hour from hardening(warm part)

in the range 550-630°Cfor 4-6 hours according to hardness required, the

dimensions of the parts and operating conditions.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company DONGGUAN MISUNG MOULD STEEL CO.,LTD
Location Postal code is 523196, No.8 shanghe precinct, wangniu dun town , dongguan city. Guangdong province China
Contact Person Merain Pan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.