Gold Mine Production Line
Price:
35000-95700USD/set
MOQ:
1
Delivery Time:
25-40 days
Brand:
hengyang
Product Description
Gold Mine Production Line
The core equipment of a small-scale beneficiation complete leaching gold processing plant includes crushers, grinding machines,flotation machines, and gravity separation equipment. These devices are mainly used for processing raw materials, extracting gold,and separating gold.Specifically, the crusher is used to crush the raw ore into appropriate sizes, while the grinder further grinds the ore for better extraction of gold. The flotation machine separates gold by attaching gold particles to bubbles through the action of reagents. The reselection device utilizes the difference in the specific gravity of gold for separation. In terms of process flow, the raw materials are first crushed and ground, then flotation is carried out, and finally gold is further extracted through gravity separation equipment. The entire process requires strict control over the amount and duration of medication used to ensure the most efficient extraction of gold. We supplied full set plant: vibrating feeder, jaw crusher, belt conveyor, cone crusher, double roll crusher, ball mill, spiral classifier, vibrating screen, magnetic separators.![]()

Rock gold (hard rock gold) processing is a systematic beneficiation process designed to extract gold from gold-bearing vein ores. The complete production flow generally includes crushing, grinding, gravity separation, flotation, leaching (CIL/CIP), and smelting, to achieve efficient gold recovery.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Zhengzhou Hengyang Industrial Co., Ltd
Location
500m West, Cross road of Rizhao and Industrial Road, Mazhai Industrial Zone, Zhengzhou City, China
Contact Person
Gary