Gnee Steel (tianjin) Co., Ltd.
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

Streamline Your Construction Process with Rail Fasteners for Steel Beam Connection

Price Negotiable
Price: Negotiable
MOQ: 1 Tons
Delivery Time: 30 days
Brand: Gnee Rail
Product Description

Product features

 

1. The base plate is welded to the upper wing edge plate of the steel crane beam by two-sided side welding, which can ensure that the lateral force of the crane is transmitted to the crane beam smoothly and evenly, and avoid the defect of a large number of holes in the wing plate of the crane beam.

2. The base plate and the upper buckle plate of the S-CGWK rail clamp are connected by a ball joint. Therefore, under the action of lateral force, deflection is allowed. It can reduce the harm of the lateral impact of the crane to the track, crane beam and brake system and other structures.

3. The base plate is welded to about 1m/m on the bottom edge of the track, which plays a good role in limiting the left and right displacement of the track.

4. Special bolts make the force more reasonable and make the upper cover plate free to disassemble and assemble, providing extremely convenient conditions for construction, installation and maintenance.

5. The S-CGWK rail clamp is small in size, light in weight, strong in force, economical and beautiful.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Gnee Steel (tianjin) Co., Ltd.
Location FLAT/RM 1512 15/F LUCKY CENTRE NO.165-171 WAN CHAI ROAD WAN CHAI HK
Contact Person Kelly Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.