Gnee Steel (tianjin) Co., Ltd.
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

GB Standard Train Steel Rail QU100 Perfect Solution for Modern Railway Construction

Price Negotiable
Price: Negotiable
MOQ: 1 Ton
Delivery Time: 30 Days
Brand: GNEE
Product Description

 

 

QU100 steel rail, where "QU" represents Crane Rail, and 100 represents a width of 100 millimeters for the rail head.

 

QU100 steel rails are mainly used for laying tracks for large and small cranes, suitable for large-scale projects, port container lifting, and other scenarios. They are specialized lifting rails for heavy equipment such as gantry cranes. QU100 steel rails are usually made of high-strength alloy steel materials such as U71Mn, which have good mechanical properties and wear resistance.

 

Material: U71Mn

Weight:88.96Kg/m

Length:12m

Standard:YB/T5055-2014

 

GB Standard Train Steel Rail QU100

 

type weight (kg/m) material length (m)
QU100 88.96 U71Mn 12
rail height (mm) bottom width (mm) head width (mm) web thickness (mm)
150 150 100(108) 38

 

 


 

Other Features

 

QU100 steel rails have high tensile strength and can withstand large loads, ensuring the stable operation of the crane.
GB crane rail stability is good: its wider rail head and larger waist thickness provide better stability of the rail during operation, reducing vibration and noise.

 

The QU100 steel rail has strong wear resistance and is made of high-strength alloy steel material, which has good wear resistance and extends the service life of the rail.

 

The installation and maintenance of QU100 steel rails are convenient, and the standard length of QU100 steel rails is usually 6 to 12 meters, which is easy to transport and install. Meanwhile, its cross-sectional shape and material properties also make maintenance more convenient.

 

 


 

FAQ

 

How to ensure the safety of rails?
Our rails are subject to strict quality control during production, and each rail is carefully inspected to ensure its safety and reliability.

 

Will there be cracks on the surface of the rails?
We use advanced production processes to ensure that the surface of the rails is flat and crack-free, while conducting strict quality inspections.

 

How long is the rail production cycle?
Depending on the order volume and specifications, the production cycle of rails is generally 1-4 weeks.

 

How to choose the right type of rails?
Our professional sales team will help you choose the right type and specification of rails based on customer needs, project requirements and budget.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Gnee Steel (tianjin) Co., Ltd.
Location FLAT/RM 1512 15/F LUCKY CENTRE NO.165-171 WAN CHAI ROAD WAN CHAI HK
Contact Person Kelly Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.