DOW UF Membrane Modules SFP-2860/SFD-2860 with 51m² PVDF Membrane Area and 2.0-6.1 m³/hr Flow Range
Price:
Negotiable
MOQ:
1 pc
Delivery Time:
5- 8 work days
Brand:
DOW
Product Description
DOW UF Membrane Modules SFP-2860 / SFD-2860
Key Features
- Superior Filtration Efficiency: Effectively removes suspended solids, colloids, bacteria, and various contaminants
- Chemical Compatibility: Withstands broad range of chemicals for robust operation
- Durable Construction: Advanced materials ensure resilience in challenging conditions
- Energy-Efficient Operation: Low-pressure operation reduces energy consumption and costs
- Versatile Applications: Suitable for water purification, wastewater treatment, food & beverage, and pharmaceutical industries
Product Specifications
| Model | Type | Part # | Membrane Area (m²/ft²) | Module Volume (Liters/Gallons) | Weight (Kg/lbs) |
|---|---|---|---|---|---|
| SFP-2860 | Pretreatment | 280933 | 51 / 549 | 35 / 9.3 | 48/83 / 106/183 |
| SFD-2860 | NSF/ANSI 61 Drinking Water | 324168 | 51 / 549 | 35 / 9.3 | 48/83 / 106/183 |
Dimensions
| Parameter | L (mm) | L1 (mm) | L2 (mm) | L3 (mm) | D (mm) | W1 (mm) | W2 (mm) |
|---|---|---|---|---|---|---|---|
| Value | 1860 | 1500 | 1630 | 1820 | 225 | 180 | 342 |
Operating Parameters
Performance Specifications
| Parameter | SI Units | US Units |
|---|---|---|
| Filtrate Flux @ 25ºC | 40-120 l/m²/hr | 24-70 gfd |
| Flow Range | 2.0 - 6.1 m³/hr | 9.2 - 26.7 gpm |
| Temperature | 1-40ºC | 34-104ºF |
| Max. Inlet Module Pressure (@ 20ºC) | 6.25 bar | 93.75 psi |
| Max. Operating TMP | 2.1 bar | 30 psi |
| Max Operating Air Scour Flow | 12 nm³/hr | 7.1 scfm |
| Max Backwash Pressure | 2.5 bar | 36 psi |
| Operating pH | 2-11 | |
| NaOCl (max.) | 2,000 mg/L | |
| TSS (max.) | 100 mg/L | |
| Turbidity (max.) | 300 ntu | |
| Particle Size (max.) | 300 µ | |
| Flow Configuration | Outside in, dead end flow | |
| Expected Filtrate Turbidity | ≤0.1 NTU | |
| Expected Filtrate SDI | ≤2.5 | |
Operation & Safety Guidelines
System Start-up Procedures
Proper start-up is essential for preparing membranes for operational service and preventing damage. Follow these critical steps:
- Complete membrane pretreatment and installation before start-up
- Calibrate instruments and perform system checks
- Avoid sudden pressure fluctuations during all processes
- Flush system to eliminate shipping solution
- Remove residual air from system
- Manually initiate equipment
- Aim for 60% of design permeate flow during initial operations
Important: NSF/ANSI 61 certified drinking water modules require specific conditioning procedures before generating potable water. Refer to product technical manual for detailed procedures.
Regulatory Compliance
Drinking water modules may be subject to additional regulatory constraints in certain countries. Verify local regulatory guidelines and application status before usage and sale. Effective reduction of cysts and pathogens depends on complete system design, operation, and maintenance.
Additional Resources
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wuxi Fenigal Science & Technology Co., Ltd.
Location
606#, Building-B, Dicui Rd. 100, Binhu, Wuxi, Jiangsu, China
Contact Person
Joe Zu