Shanghai Huiyi International Co., Ltd.
                                                                                                           
Verified Supplier
9 Years
Since 2017
Menu

Fiberglass Wool Thermal Insulation Pipe Construction Material

Price Negotiable
Price: Negotiation
MOQ: 1 Container
Delivery Time: 15-35days
Brand: HUIYI
Product Description

Fiberglass Wool Tube Construction Material Glass Wool Thermal Insulation Pipe

 

 

The glass wool product is placed in the glass of meltdown appearance proceed the fiber turn and spray the resin of solid that draw the hot silk wadding form material, then turn through hot solid the deep processing handles and can also make into the series and various products.

 

HUIYI glass wool felt is divided into bare felt and veneer rolled felt, which can effectively resist moisture, sound absorption, corrosion, and aesthetics. The surface layer is added to increase the product's breaking resistance, breakdown resistance, high tensile strength, beautiful appearance and simple construction.

 

 

 
Item Name
 
Specification
Unit

 

Factor of heat conduction(Temperature 25°C)

 

≤0.034
W/mk

 

Combustion performance

 

non-inflammable,A1
-

 

Organic content

 

≤5
%

 

Hydrophobic coefficient

 

≥98
%

 

Reshrinking temperature

 

≥350

 

Formaldehyde emission

 

≤1.5
mg/L

 

Water absorption coefficient

 

≤1.5
%

 

Water content

 

≤1.0
%

 

Slag wall content(dia>0.25mm)

 

≤0.3
%

 

Average diameter of fiber

 

≤8.0
μm

 

Odor emission

 

no
-

 

Asbestos

 

asbestos free
-

 

Pipe O/D
mm
Tube Wall Thickness (mm)
  21-610 20 25 30 35 40 50 60 70 80 90 100
  Length
1 linear metre
20 25 30 35 40 50 60 70 80 90 100

Advantages of Fiberglass wool insulation :

  1. Fireproof
  2. Waterproof
  3. Lightweight
  4. Eco-friendly
  5. Easy to install
  6. Heat insulation
  7. Thermal insulation
  8. Soundproof

 

Package and Delivery of Fiberglass wool insulation :

 

 

FAQ:

 

Q: Can you accept neutral packing & OEM ?
A: Normally, our packing is carton , but we can accept the neutral packing and OEM.

Q: Can you provide the sample for free ?
A: We provide some samples for free.

 

Q: What's the lead time?

A: 15-35 days after receipt of advanced payment

 

Q: What's the payment term?

A: 30% advanced payment and 70% paid prior to load by TT. and large amount can be paid by LC.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shanghai Huiyi International Co., Ltd.
Location Room704-2,A7 building,No.1688,North Guoquan Road,Yangpu District,Shanghai,China.
Contact Person Zhang Hui

Request A Quote

Please check your email address.
Your message must be at least 20 characters.